Installation Guide
38 support@cedarsummitplay.com
10 x #8 x 1-1/2” Wood Screw
1 x CE Gap Board 1 x 4 x 38-3/4”
1 x CE Gap Board 1 x 6 x 38-3/4”
0839
0840
HardwareWood Parts
Fig. 13.4
0437
2395
0839
0834
0840
Flush
x5per
board
2586
S2
Step 13: Front Frame Assembly
Part 2
E:Attach(0839)CEGapBoardtoeach(2586)FloorFrontBackand(2587)FloorJoistonthetheSwingWall
Sideusing5(S2)#8x1-1/2”WoodScrews.(g.13.4and13.5)
F:Flushtothetheoutidefaceof(0834)SLFloorattach1(0840)CEGapBoardtoeach(2586)FloorFrontBack,
(0834)SLFloorand(2587)FloorJoistusing5(S2)#8x1-1/2”WoodScrews.(g.13.4and13.5)
Slide Wall
Swing Wall
Fig. 13.5
S2
2586
0437
2586
0834
2586