Installation Guide
37 support@cedarsummitplay.com
1 x Floor Joist 5/4 x 4 x 45-1/2”
4 x #8 x 3” Wood Screw
Hardware
Wood Parts
2587
Step 13: Front Frame Assembly
Part 1
Inside View
Fig. 13.1
2025
2587
S4
0834
2587
S4
S4
0437
1-13/16”
A: Removethebottomboltin(2025)WallMount.Donotdiscardthisboltyouwillre-installitafterthe(2587)
FloorJoistisattached.(g.13.2)
B:Fromtheinsideoftheassemblymeasure1-13/16”downfromthetopof(0437)SWFloorandthenattach
(2587)FloorJoistwith2(S4)#8x3”WoodScrews.(g.13.1,13.2&13.3)
C:Attachtheothersideof(2587)FloorJoistushtothetopof(0834)SLFloorwith2(S4)#8x3”WoodScrews.
(g.13.1)
D: Reinstallthebottomboltin(2025)WallMountandtightenbothbolts.(g.13.2)
Flush
Fig. 13.2
0437
0437
Fig. 13.3
Removethisbolt,
thenre-attach
afterjoistis
installed.