Installation Guide
35 support@cedarsummitplay.com
1 x SL Floor 2 x 4 x 41-1/2”
1 x Ground SL Side 1 x 5 x 41-1/2”
1 x SL Spacer 2 x 3 x 41-1/2”
Noticethehole
locations
Wood Parts
Hardware
4 x 1/4 x 4” Hex Bolt (1/4” lock washer, 1/4” at washer, 1/4” t-nut)
2 x 1/4 x 4-3/4” Hex Bolt (1/4” lock washer, 1/4” at washer, 1/4” t-nut)
4 x #8 x 2-1/2” Wood Screw
1406
2599
0834
H4
1400
Fig. 11.1
1406
1/4”lock
washer
1/4”
t-nut
1/4”at
washer
H4
0834
S3
S3
H4
Tight
x4
1401
2599
Step 11: Slide Wall Assembly
A:Attach(1406)GroundSLSidetotheremaining2PostAssemblieswith4(H4)1/4x4”HexBolts(withlock
washer,atwasherandt-nut)asshowning.11.1.Keep bolts loose.
B: Attach(0834)SLFloortoeach(1400)Postwith2(H6)1/4x4-3/4”HexBolts(withlockwasher,atwasherand
t-nut).(g.11.1)Keep bolts loose.
C: Tighttothebottomof(0834)SLFloorattach(2599)SLSpacertoeach(1400)Postwith4(S3)#8x2-1/2”
WoodScrews.(g.11.1)
D: TightenalltheboltsintheSlideWallAssembly.
H6
H6
H6
1400