Installation Instructions
If the brighter cell is between the numbered temperature
cells, position the panel between the corresponding
temperature indicator lines (gure 2). Example: If the
PanelThermometer reads 65, align the second panel to
the 65 temperature indicator line on the rst panel. If the
cell between the 65 and 100 is brighter, position the panel
between the 65 and 100 temperature indicator lines.
First Course
Installation is made simpler with these easily identiable
features marked on the front the shingles.
1. Use a full panel to start your rst course.
2. Starting on the right side of the wall, hook the bottom
locking leg of the panel into the starter strip and slide
panel into the cornerpost or receiving channel
(gure 3). Leave 1/4"
space between the
panel and the corner
for expansion. If you
are planning to install
the Mitered Cornerpost,
space the panel 3" from
the corner.
3. Fasten the panel to
the wall by rst nailing
through the round
center hole in the
nailing hem at the top
of the panel. Continue
nailing the panel with
5 nails: one in the
right-end nail slot
and one at each of the QuickReference™ Nail Mark
Indicators (gure 4). Leave 1/8" to 1/16" between the
nail heads and the panel to allow freedom of movement
during normal expansion and contraction. The S7
panel features NailStop™ to guide in correct nail head
clearance.
4. Install the next panel by positioning it below the starter
strip and next to the rst panel. Push in and up to
lock the panel into the starter strip, as shown in
gure 5. Space the second panel according to the
panel temperature at the corresponding temperature
indicator lines (gure 1). Gently tap the outside of the
HammerTapper™ ribs to properly position the
panel left or right.
5. Nail the panel into position starting with the round
center hole and then placing the next nail in the right-
end nail slot (which overlaps the previous panel’s left-
end slot) so that the nail goes through both panels’ nail
slots simultaneously. Continue nailing the rest of the
panel using the procedure in step 3.
6. Continue to install remaining panels of rst course as
described in steps 3 through 5.
Second Course
7. Cut 26" off of the right side of the
S7 panel at indicator 26, which
is located on the hanger below
the nail slots, cutting straight
through the panel (gure 6). Drill
a 3/16" hole in the center of the
nail hem and nail siding through
this hole to control direction of
expansion and contraction.
8. Set the spacing using the PanelThermometer and
temperature indicator lines. Another option is to nail
each end of a nail slot located at the center of the
panel and repeat steps 4-6.
Third Course
9. Cut 50" off of the right side of the S7 panel at indicator
50, which is located on the hanger below the nail slots,
cutting straight through the panel. Drill a 3/16" hole in
the center of the nail hem and nail siding through this
hole to control direction of expansion and contraction.
Another option is to nail each end of a nail slot located
at the center of the panel.
Continue to stagger panel courses according to steps
1 and 9, repeating the same process of 1st course, 2nd
course, 3rd course to ensure a random shingle pattern
up the wall (gure 7).
30
NOTE: If two temperature cells on the
PanelThermometer show a color change, use the
brighter color as the indicator.
NOTE: Care must be taken to not align the shingle
separation when installing on a gable end. Do not
follow the full, -26", -50" pattern in the gable.
quick reference nail
mark indicators
2627 2425 2223 2021 19
17
18
cut at indicator 26
1/4"
gure 3
gure 4
gure 5
gure 6
gure 7
2627 2425 2223 2021 19 1718
-26
-26
Full
Full
-50
-50