PLEASE READ INSTALLATION INSTRUCTIONS BEFORE ASSEMBLING Rev. C IF YOU ARE MISSING PARTS OR HAVE 4’ to 8’ Aromatic Cedar Closet QUESTIONS PLEASE CONTACT: Model # 801 customerservice@cedargreen.
Hardware Identification Sheet ITEM PICTURE A DESCRIPTION QTY Rafix Connector Bolt 24 Wardrobe Tube B Support C Dry Wall Anchor Flathead Phillips Screw D #6 x 1/2" Panhead Phillips Screw E #8 x 1" Flathead Phillips Screw F #8 x 3/4" 3 pairs 12 8 12 14 G Wall Rail 44" 1 H Wall Rail 18" 1 Wall Rail Covering Strip I 43" Wall Rail Covering Strip J 53" 1 1 K Wardrobe Tube 24" 2 L Wardrobe Tube 51" 1 M Panel Bracket 4 N Shelf Support 14 Left Panel O Hanger 2 P Right
Installation Steps Using a level draw a horizontal line across back of closet, 74” above floor. Locate studs using a stud finder, lightly mark wall 1/2” below horizontal line to reference stud locations. Mark vertical panel locations, using left wall as starting point. Mark V at 25” for left Tower Panel (2). Mark V at 44” for right Tower Panel (2). Mark V at right for right Wall Panel (1). If any vertical panels are not within 3” of a stud a Dry Wall Anchor (C) is needed.
Mount Wall Rail (G) from left to right on top of horizontal line. Using Panhead Phillips Screw (E) and Dry Wall Anchor (C) when necessary. For mounting holes on top of stud reference marks, drill a pilot hole using a 1/8” drill bit. Mount Wall Rail (H) from right to left. Using Panhead Phillips Screw (E) and/or Dry Wall Anchor (C). Wall Rail (G & H) must be screwed into studs behind wallboard as wall rail will fall down when screws pull out of drywall if it is only screwed into drywall.
Add Panel Bracket (M) onto bottom of Wall and Tower Panels (1 & 2), using Flathead Phillips Screws (F). Using Flathead Phillips Screws (F) attach Left Panel Hanger (O) onto Wall Panel (1) and Tower Panel (2). Using Flathead Phillips Screws (F) attach Right Panel Hanger (P) onto Wall Panel (1) and Tower Panel (2). Hang left Wall Panel (1) onto Wall Rail (G). Hang right Wall Panel (1) onto Wall Rail (H). Hang left Tower Panel (2) onto rail at vertical “V” location.
Insert Rafix Connector (Q) into shelf holes with the openings facing outward. Mount Rafix Connector Bolt (A) 9 holes down from top on left Wall Panel (1) and Tower Panel (2). Set 24” Shelf (3) on to Rafix Connector Bolts (A). Set 18” Shelf (4) on to Rafix Connector Bolts (A) in tower. Set Adjustable Shelf (6) on to right Wall Panel (1), pull or push to adjust shelf width to desired length. Tighten all Rafix Connectors by positioning screwdriver at 25°and turn clockwise.
Mount Wardrobe Tube Support (B) in left wardrobe section two hole down from both 24” shelf (3). A Flathead Phillips Screw (D) can be mounted into Wardrobe Tube Support (B). Set both Wardrobe Tube 24” (K). Mount Wardrobe Tube Support (B) in right wardrobe section 2 holes down from Adjustable Shelf (6). Measure distance between Wardrobe Tube Support (B), mark Wardrobe Tube 51” (L) and cut with Hacksaw. With Shelf Support (N) add 18” Tower Shelf (5) to tower where desired.
Be creative with your Cedar Closet System, suggested combinations: 8