Specifications
ACI/Frangkiser Hutchens Architects 4-07058
Liberty "North" Second High School
Liberty Public School District #53
Building Construction Bid Set
FOOD SERVICE EQUIPMENT 11400-44
B. Condensing units shall be set on the roof top above the walk-in
location, set on curbs provided by other trades.
C. Extend evaporator condensate drains as shown. Extend drain
lines with copper tubing having minimum diameter of 5/8" radius
per manufacturers recommendations. Run lines as shown with
minimum slope of 1/4" per foot.
D. It is the intention of this specification for a complete
refrigeration system, including all refrigeration specialties
and all other parts, devices and accessories required for a
complete and properly functioning system, furnished and
installed whether or not each item is specifically mentioned in
the specifications.
ITEM NO. A10 - COMPRESSOR, -10 FREEZER
REQUIRED
A. Furnish all labor, materials, and equipment for complete
installation of walk-in freezer refrigeration system. Shall
include time clock, expansion valves, solenoid valves,
temperature control, sight glass, drier, head pressure control,
crankcase heater, anti-sweat heater, cables, pilot light,
evaporator, outside condensing units, accessories and all other
required parts and refrigeration specialties for complete first
class installation. Refrigerants shall be in compliance with
the Montreal Protocol for reduced CFC content; freezer using
R-404A. Install compressor, refrigerant piping and
refrigerant as specified, hereinafter. See Refrigeration
Requirements sub section of this specification section.
Equivalent manufacturers must provide equipment of similar
dimensional size, and comparable construction and same or
higher BTU refrigeration capacities with similar utility
requirements to the refrigeration system on which this
specification is based. Use of equivalent manufacturers
equipment shall not require major changes to the plan, the
equipments location or to electrical service designated within
the contract documents. Any minor changes required are the
responsibility of the provider to coordinate with other trades
and all costs associated with changes shall be covered by the
provider. Listed Equivalent manufacturers are responsible for
verifying they comply with these requirements before submitting
a bid.