ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 SECTION 11400 - FOOD SERVICE EQUIPMENT PART 1 - GENERAL 1.1 A. 1.2 Related Documents Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification sections, apply to work of this section.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 11. Divisions 16 28 < BY ADDENDA 1>- Electronic Safety And Security. D. The successful bidding provider of food service equipment will be required to provide an itemized breakdown of cost for each individual equipment item. Owner will use the list, when necessary, for value engineering only. E.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 2. These specifications are in abbreviated form and contain incomplete sentences. Omissions of word or phrases such as "The provider of food service equipment shall", "Shall", "shall be" "as noted on drawings", "according to the drawings", "a", "an", "the" and "all" are intentional. Omitted words and phrases shall be supplied by inference. 3.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 24. "Vendor" refers to an owner contracted supplier, outside the contractual obligations of this project, who will provide the designated equipment at the direction of the owner. 1.3 A. Submittals Rough-in Plans: Dimensioned rough-in plans, and diagrams, prepared for this project must be submitted within thirty (30) days after receipt of Contract.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 a. Fire suppression / hood shop drawings shall include a schematic diagram illustrating the following information specific to this project for each hood; 1) All discharge nozzle locations. 2) Suppressant agent tank(s), tank sizes and release mechanism location. 3) Fusible link locations. 4) Emergency pull station location.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 E. Maintenance Data: At minimum, furnish to the Owner Three (3) sets of bound maintenance and parts manuals, for all items of standard manufacture. Assemble manuals in book form, arranged by item number. Provide an index in the front listing Item No., Description as shown on Food Service drawings and manufacturer.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 2. UL Certification: Provide electric and fuel-burning equipment and components that are evaluated by UL for fire, electric shock, and casualty hazards according to applicable safety standards and that are UL certified for compliance and labeled for intended use. 3. ASHRAE 15, "Safety Code for Mechanical Refrigeration." 4.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set C. 1.5 4-07058 When requested by Montgomery Hoffman Associates, bidding provider of food service equipment and their sub-trades shall provide qualification information including a list of previous similar projects, their location, monetary size of contract and a reference architect/food facility consultant/owner contact. Project Conditions A.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set K. 1.6 4-07058 Equipment price increases not included in bidders proposal, will not be allowed after the bid opening. Coordination A. Coordinate work with work of other trades at project site and carefully schedule work with job progress. B. Architectural, Mechanical & Electrical Requirements; 1.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 unless noted otherwise. Responsibility includes but is not limited to providing; floor sinks & drains; piping for water, and waste; shut-off & stop valves; grease traps and interceptors, "P" traps, unions, back flow prevention devices (except as provided within this section, ref. specific equipment items) etc., as required for proper operation of the equipment.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 c. Work tables & sinks with electrical receptacle boxes where noted, d. Dish tables, dish machines & booster heaters, e. Food preparation equipment, f. Refrigerator / freezer / hot holding cabinets, g. Serving equipment, h.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 C. Extended warranty and conditions of service on items of standard manufacture, as established by manufacturer of such equipment, shall apply where extending beyond warranty and conditions of service set forth in these Specifications.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 D. "Refrigeration Installation" shall include uncrating and setting-in-place of compressors and accessories, installation of refrigerant lines and refrigeration accessories, initial charge of refrigerant for each system, system(s) start-up, testing and temperature adjustment. E.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 specified) for each refrigeration system. Provide initial charge of lubricating oil, for compressor unit, in accordance with manufacturer's recommendation. PART 2 - PRODUCTS 2.1 Manufactures A. The food service equipment bid shall quote only manufacturers listed with-in the specification or addenda.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 non-magnetic sheets, free of buckles, waves, and surface imperfections. Provide No. 4 polished finish for any surfaces exposed to view, 2B or 2D finish on unexposed surfaces. Only in areas exposed to high temperature and high acid/chloride exposure, type 316 Stainless Steel will be used. 2. 304 Stainless Steel Tube: ASTM A 554, Type 304 with no. 4 polished finish.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 8. Solid Surface Material: ½" Solid polymer fabrication material; cast, filled acrylic or polyester; not coated, laminated or of composite construction meeting ANSI Z124. Corian by Dupont or Surell by Formica Corporation. Matte finish with gloss range of 5-20. Submit 2" x 2" x 1/4" samples for color / pattern selection by the architect.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 2. All custom fabricated equipment, materials and workmanship, shall be best of their respective kinds and equal in detail, quality and construction. 3. Neatly cut and finish all openings in equipment required by other trades for electrical and plumbing leads. 4. Welding: a.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 non-movable counter top equipment without legs shall be sealed to the countertop. Any joints or portions there of exceeding 3/8" shall be covered for its entire length by a Stainless Steel closure of a design approved by the Food Facilities Consultant. b.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 allowed. Sink bowl bottom creased/sloped to drain to provide complete drainage of sink. At drain valve location, sink bottom ferruled downward to allow installed drain valve grate to set flush to or below plane of sink bottom. 14 ga. S/S ―L‖ bracket stud bolted to bottom of sink bowl to support drain twist action handle.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 d. When sinks are specified integral to the Dish Table Top, construct sink of 14 gauge with all bowl vertical and horizontal corners coved on 1" R. No solder or caulked fillets allowed. Sink bowl bottom creased/sloped to drain/disposal opening, to provide complete drainage of sink.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 noted otherwise. Fully weld cross rails to uprights. Uprights shall be fitted at top with Leg Gussets and at bottom with Bullet Feet unless specified other wise.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 receptacle box stud bolted to bottom of shelf, where shown. Provide access for concealing feed wire conduit thru shelf supports and securing conduit below shelf in a concealed manner. 11. Enclosed Cabinet Bases and Shelves: a. Materials; 1) Metal Tops; shall be Stainless Steel.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 not exceed 6'-0". 12. Hinged Doors: a. Materials; 1) Door interior and exterior surfaces; shall be Stainless Steel. 2) Hinged Door Pulls; Provide door with integral pull, 1" x 1" x 8"L. inverted channel style pull at top of door, latch side (pull as detailed / approved by Food Facility Consultant).
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 channel style pull at drawer face top (pull as detailed). 2) Thermoplastic Drawer Pans; Provide heavy duty thermoplastic drawer pans with full 1/4" flanges; coved corners; smooth interior - stipple exterior. Provide Component Hardware model S80-2020, nominal 20" x 20" x 5"H. unless noted otherwise.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 standard. d. Seal splash top, back edge to wall. e. Construct drain boards for sinks of 14 ga. with all vertical and horizontal corners coved on ½" R. No solder or caulked fillets allowed. Drain boards shall be an integral part of the sink. All exposed edges shall have continuous formed 2"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 1-1/2" on 90o angle. 17. Stationary Under Shelves: a. Materials; 1) Shelf top; shall be Stainless Steel. 2) Shelf under bracing; shall be 14 ga. Stainless Steel. b. Shelf shall be 16 gauge.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 20. 4-07058 Elevated Shelves: a. Materials; 1) Shelf top / tubing / tubing supports / double pan box supports shall be Stainless Steel. 2) Solid top shelf under bracing and supports shall be Stainless Steel. b. Shelf tops shall be 16 ga. Edges as specified for each specific item. Turn edges adjacent to taller items up 2" on 1/4"R. flush to surface face.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 a. Provide Stainless Steel enclosure panels and fillers where gaps or spaces occur at equipment tops and bodies, due to interferences or irregularities in building walls, columns, outlets, pipes, etc. and above equipment to ceiling as shown and detailed on drawings.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 4) Cabinetry Hardware; Hardware shall comply with American National Standard for Cabinet Hardware, ANSI A 156.9, Type 2 (institutional). 5) Hinged Doors Locks; Provide Kason 7600 series or equivalent utility locks; die-cast zinc; chrome finish; 3/4" cylinder rotating cam type utility lock; key removable in locked and unlocked position; (2) brass keys per lock.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 utilizing electrical power shall be UL or CSA listed. B Refer to accompanying Food Service Equipment drawings for equipment quantities and utility configurations required. C.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set bottom shelf 6" AFF and top shelf 48" AFF. the following; 4-07058 Units comprised of 1. A1A - 5 Units comprised of 2448HD shelves, 24"D. x 48"L. 2. A1B - 2 units comprised of 2436HD shelves, 24"D. x 36"L. 3. A1C - 1 unit comprised of 2460HD shelves, 24"D. x 60"L. ITEM NO. A2 - SHELVING; CHROME WIRE REQUIRED A.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 rigid, (2) swivel ITEM NO. A4B - WORK SPACE BUILT IN CABINETRY BY OTHER TRADES ITEM NO. A4B - LATERAL FILE BY OWNER ITEM NO. A5 - LOCKERS; (2) TIER‘ BY OTHER TRADES ITEM NO. A6A - CABINET; CLEAN LINEN REQUIRED A. Provide Lyon Metal Products Inc. model 1090*M112, 36"W. x 24"D. x 78"H. storage cabinet.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 1. Flat top with exposed edges having 1-1/2"x 90 straight turn down with ½" toe-in on 30o angle. 2. At walls, provide 2" wall flush turn-up. B. Standard Open Frame Base with Stationary Under Shelf, 3'-6‖L. ITEM NO. A6D - WALL SHELF BY ALTERNATE A. By alternate, provide and mount on wall, constructed per standards for Elevated Shelves, a 10"W. x 66"L.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 drawings and specified herein. Shall include lights, thermometers, pilot lights and accessories for complete first class installation. Install compressors, refrigerant piping and refrigerant as specified. B. Specification is based on walk-in boxes as manufactured by Kolpak*M112, N.S.F. approved. Alternate manufacturers include, Penn, Norlake, Master-Bilt.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 Walk-in wearing surface flush with adjacent kitchen floors. Provide 6 mil. polyethylene film vapor barrier on warm side of floor and wall panels in the recess. FSC shall provide operating fans or install and have evaporators wired to thoroughly ventilate box interior, WITH DOOR REMOVED, while concrete is curing.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 H. Hinged Door(s) shall be 36" x 78". Construct door exterior with 22 ga. stainless steel, interior of same material as interior walls. Doors shall be infitting flush type and with insulation same thickness and material as wall sections. Fiberglass Reinforced Plastic door perimeter, jamb and threshold.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 diameter N.S.F. listed chrome plated dial thermometer. 7. Provide door with cylinder operation dead bolt lock with reinforced installation in door and panel, safety release on inside. All door keyed alike. Provide (5) keys. 8. On exposed-to-view exterior and interior of walk-in doors, provide 36"H. wainscots constructed of .
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 walk-in is adjacent to interior or exterior walls, jambs and/or columns. Crimp all angle trim strip edges down slightly, to hug adjacent surfaces. Attach trim strips with 1/8" aluminum pop rivets, using only minimum required number to give neat installation. L.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 front wall). Freezer being completely free of the refrigerator for use and operation. Unit shall be installed on recessed floor/slab furnished by General Contractor, see detail on drawings. Install floor at same elevation as finished kitchen floor. E.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 1. Provide verification, as required by the code authority, that the box complies with the code requirements for use of foam plastic insulation in buildings and structures. Cost of the verification to be borne by the provider of the walk-in box. 2.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set opening and door. section. 4-07058 Factory-wire heater wires to j-box at door a. If non-heat controlled antisweat heater(s) are used at entry door, the total door rail, glass and frame heater shall draw no more than 7.1 watts per square foot of door opening (for freezers). b.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 provide a light switch w/ pilot light. Light switch is pre-wired to a junction box at the latch side upper corner of the door opening; wiring in conduit concealed within the insulated panel. 2. Provide Nine - (2) bulb low temperature fluorescent interior lights. Approx. 48"L. X 6-3/8"W. x 4"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 required parts and refrigeration specialties for complete first class installation. Refrigerant shall be in compliance with the Montreal Protocol for reduced CFC content; refrigerator using R-404A. Install compressors, refrigerant piping and refrigerant as specified, hereinafter. See Refrigeration Requirements sub section of this specification section.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 B. Condensing units shall be set on the roof top above the walk-in location, set on curbs provided by other trades. C. Extend evaporator condensate drains as shown. Extend drain lines with copper tubing having minimum diameter of 5/8" radius per manufacturers recommendations. Run lines as shown with minimum slope of 1/4" per foot. D.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 l.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 installed whether or not each item is specifically mentioned in the specifications. ITEM NO. A11A - PAN RACK; UNIVERSAL ROLL-IN REQUIRED A. Provide Cres-Cor Model No. 207-UA-12AC*M112, roll-In refrigerator/hot cabinet racks, overall 24-1/2"W. x 25-1/8"D. x 64-1/2"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 and fittings; ―Ultra Guard‖ UG-26 insulation at top, sides, back, bottom, door; recessed hand grips on each side; flush mount stainless doors with cabinet mounted high temp.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 series shelving system. Constructed with hi-tensil extruded 1-1/2" x 1-3/4" x .070 wall aluminum tube, welded into a rectangular frame with length wise laterals welded inside at 4" apart; each shelf corner with welded in H.D. extruded aluminum post collar having set screw to allow adjustment; posts are extruded 6063-T5 aluminum alloy pipe with .
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 the following criteria as required: 1. Continuous equipment temperature monitoring and reporting (-20F through 300F). 2. Temperature verification in the event of equipment failure. 3. Energy management adjustments (defrost cycles, minimum/maximum temperature settings, average temperatures, etc.). 4. Door openings/closing/time open. 5.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 2. Hardware; PC, Celeron/Pentium 1.2 GHz Processor, 512 MB Memory, 2 GB Available Disk Space, Network Card (10/100), Serial Ports (2), Modem Available, CD-RW Drive. 3. Software; PC, Windows 2000 Pro or XP Pro, Internet Information Services, Internet Explore 5.5+ F. The system shall monitor the following item #(s) on this project: 1. Walk-ins Items No. A7, A8, T1.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 sides. Overall 48"L. x 18"D. x 30"H. Fabricated of 18Ga. furniture steel as integral units, flush face joints, angle reinforced or welded corners, 1-1/4"W. exposed face rails and stiles with 3/4" x ½" rabbet for doors, finished ends. 5/8" thick insulated double pan doors with 18 ga. outer and 20 gauge inner heads, 14 ga.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 2. Provide sink bowl with 2" rough chrome rotary action lever drain having stainless steel bar and flat stainless steel strainer plate. Provide with 6" tail piece. a. Fisher Mfg. Co., 22209*M112 b. Chicago Faucet 1367-NF C. Provide Can Opener at staff right end, as shown.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 shown, at ends and in drawer enclosures per standards. 2. Provide (2) Electrical Receptacle boxes mounted to the bottom of the elevated shelf, where shown. G. Provide, a tier of (3) Drawers, at staff right end, as shown, per standards, in Enclosed Cabinet Base. H.
4-07058 ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set REQUIRED A. Provide Hobart model HL600, Legacy Planetary Mixer, 2.7 HP, 60-quart capacity; overall 28.647"W. X 40.658"D. X 61.302"H. Four fixed speeds; gear transmission; 50 min. Smart Timer; #12 attach hub; power bowl lift; bowl guard; shift on the fly controls with soft transition to higher speeds; swing out bowl. Provide the following accessories / options; 1.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 b. T&S Brass model B-0200-LN 061X*M112 swivel nozzle or B-0201*M112 2. Provide sink bowl with 2" rough chrome rotary action lever drain having stainless steel bar and flat stainless steel strainer plate. Provide with 6" tail piece. a. Fisher Mfg. Co., 22209*M112 b. Chicago Faucet 1367-NF D.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 TWO (2) REQUIRED - TWO (2) BY ALTERNATE A. Provide Lakeside Model No. 544*M112, 650 lbs. capacity; (3) 21"W. x 33"L. shelves; overall 22.375"W. x 38.625"L. x 37.125"H.; stainless steel angle frame with push handle; open base; no mark polyurethane casters, (2) - 5" swivel & (2) 8" fixed; NSF. ITEM NO. B9A - SHELVING; POT AND PAN REQUIRED A.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 protection; 15 year anti rust warrantied posts and shelf frames; 800 lbs per shelf capacity on 48"L. shelf; 75-1/2" high posts, each unit (4) shelves high, with all standard parts and accessories necessary for a complete installation. Install with shelves at 6" - 26" - 46" - 66" AFF. Units comprised of the following; 1. Four with 2. Four 3.
4-07058 ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set A. Provide Advance Tabco Model No. 7-PS-71*M112, overall 17-1/4"L. x 15-1/4"D. X 13"H. 304 stainless steel, with deep drawn 10" x 14" x 5" bowl, recessed no drip edge. Includes; heavy gauge galvanized mounting bracket, 1-1/2" stainless steel basket drain. Provide with the following; 1. K-121 Faucet, splash-mount, gooseneck. 2. Tailpiece for the drain. 3.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 A. Provide overall 2'-6"W. x 144"L. x 36" high to top of box edge. Construct top in accordance with standard specifications for Metal Tops. 1. Provide at exposed table edges, a box edge. Angle table top up at 45 x 3/4"H. with 1" flat top, turn down 1-1/2", with ½" toe-in on 30o angle. 2. Provide a curb at the abacking table.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 E. Shared Elevated Shelf; Provide and mount at back of table, centered on the curb and overhanging equally the abacking tables, a standard 18"W. x 144"L. Shared Elevated Shelf, 18" above table top, with flat top and standard turn down with toe-in at all sides. F. Support shared elevated shelf ends with 18"W. x 1-1/2" thick box supports.
4-07058 ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set with standard 74‖ bottom Stationary Undershelf where shown. ITEM NO. B13 - STAND; EQUIPMENT REQUIRED A. Provide Lakeside model no. 517*M112 caster model machine stand with 24" x 32" shelves. 18 ga. stainless steel top with 1-1/2" x 1-1/2" reinforcing angles mounted on 12 ga. 1-1/2" x 1-1/2" angle legs with casters, (2) with brakes. NSF listed.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 components; knife motor shuts off after 30 seconds without carriage motion; double action indexing barrel cam; gauge plate interlock prevents tilt or removable of product tray when knife is exposed; gas piston lift assist cleaning leg; power loss interlock requires slicer restart; ergonomic handle; 1/2HP permanently lubricated ball bearing knife drive motor; one-pi
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 side) back to upper bars at 60" O.C. max. and fully welded to Component Hardware Group Inc., model A24-0206*M112, set screw type 1-7/8", S/S tubular shelf supports for 1-5/8" O.D. tubing. 1. Rack supported atop the elevated shelf and between S/S, 1-5/8" O.D. - 16GA. tubing supports. Supports aligning and integral with elevated shelf supports.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 a. Fisher Mfg. Co., 22209*M112 b. Chicago Faucet 1367-NF C. Provide In Line Knife Rack per standards and as detailed; at staff left end, as shown. D. Provide Electrical Receptacle boxes where shown, per standards. Electrical device(s), connection(s) and cover plate(s) by Other Trades. 1.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 Construct top in accordance with standard specifications for Metal Tops. 4. Provide with back splash, standard 6"H. x 2"W. sloped top splash with ½" turn down and closed ends at wall. 2. Provide, as detailed, box edge at exposed edges of table. Angle table top up at 45 x 3/4"H. with 1" flat top, turn down 1-1/2", with ½" toe-in on 30o angle. B.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 use of 1.4 GPM. a. Fisher Model 13390*M112; 1.15 GPM consumption. b. T & S model B-0108-C*M112; 1.2 GPM consumption. 2. Provide sink bowl with 2" rough chrome rotary action lever drain having stainless steel bar and flat stainless steel strainer plate. Provide each with 6" tail piece. a. Fisher Mfg. Co., 22209*M112 b. Chicago Faucet 1367-NF*M112. D.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 splash and gusset welded to the rear table legs at 18" AFF. J. Provide Open Frame Base, per standards. No front crossrails at under counter serviceable or mobile / movable items. Provide with standard 77‖ Stationary Undershelf where shown. ITEM NO. B21 - MULTI-FUNCTION FOOD PROCESSOR REQUIRED A.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 A. Provide Hoshizaki model no. KM-650MAH Ice Maker; overall 22"W. x 27-9/16"D. x 37-7/17"H. Crescent cube-Style; air-cooled; self-contained condenser; approximately 512-lb capacity/24-hrs; uses 21.1 gallons of water per 100lbs of ice; stainless steel finish; R-404A refrigerant; S/S evaporator; removable air filter; 208-230v/60/1 B.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 A. Provide Garland model 36ES15*M112, heavy duty electric range with boiling plate top & storage base; overall 18"W. X 36"D. X 36"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 1. Installation Kit (8720.1554US) 2. 480/60/3ph 3. UG 1 stationary Oven stand (60.30.004) OR UG I Mobile Oven Stand, open base, S/S construction, undershelf, legs w/casters (60.30.058) 4. Descaler (60.70.497) 5. Preventive maintenance Kit (PM KIT) B.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 Package includes; Soft-Touch knob controls; Knob-set temperature in 25 degree increments with LED indicators; knob-set timer with large LED countdown display; both Fahrenheit [F] and Celsius [C] on same label; 1-Shot & Pulse Steam touch pads; Pulse Steam - Interval between 1-second pulses is adjustable from 1 to 180 minutes; Cook/Hold touch pad (150F automatic s
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 1. Electronic Timer with Load Compensating Feature, two compartment (ETC2). 2. P/N 106174 Descaling Solution, (6) one-gallon containers with quart markings (DISSOLVE) 3. P/N 107142 Boiler Descaling Pump Kit, for 15 psi boilers (BDPK) B. Provide with Two (2) Dormont model W75B2Q48*M112 Safety System Hi-PSI® Water Connector Hose; 3/8" dia.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 1. 2. 3. 4. 5. 6. 7. 4-07058 Kettle shall comply with CSD-1 requirements. Hot & Cold Water Faucet (DPK) Kettle Markings (KM) Pan carrier (PCK) 2" draw-off (TS2) Spring Assisted Cover (CHS) Drain stainer (DS) B. Provide with Two (2) Dormont model W50B2Q48*M112 Safety System Hi-PSI® Water Connector Hose; ½" dia.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 mount pressure gauge and relief valve; self locking marine type tilting mechanism; welded in heating elements; large pouring lips; solid stare water level control; water resistant controls; pressure safety valve; permanently filled steam jacket needs no refilling; standard wattage. Provide with the following; 1. Kettle shall comply with CSD-1 requirements. 2.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 B. Provide Open Frame Base, per standards. 1. Provide with standard 24" Stationary Undershelf . 2. Provide below the top, (2) ladder support frames spaced 18-1/2" apart for 18" x 26" pans. Each frame with (8) horizontal 1-1/2" x 1-1/2" x 24"L. x 16 ga. S/S angle pan slides welded to (2) vertical 2" x ½" x 16ga. S/S tubes.
4-07058 ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set the features listed. Provide with the followings; 1. Additional Clamshell® Hood for model 148TH, (factory installed) (CSE24) 2. Griddle/Clamshell Stand, 47-3/4"W x 25"D x 25-1/2"H, open base w/undershelf, tubular legs w/casters, stainless steel construction (ES-G48C) 3.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 Rim Sinks. 1. 3"H x 1-1/2" raised box rim at exposed side and staff right end. 2. 10"H. x 2"W. sloped top at back and staff left end splash at wall. B. Provide in the following configuration front the staff right end; 20"W. cantilevering right end drain board; 20"W. X 26 1/2"D. X 6"H. scraping bowl with bottom mounted 6"W. X 26 ½"D. X 6"H.
4-07058 ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set clamping ring, stainless steel basket with drain plug. G. Centered behind the scraping bowl, provide a Back Splash Mount Spring Type Pre-rinse Spray; 8" centers dual valve back splash mount, flexible stainless steel hose wrapped with stainless steel support spring with wall bracket to adjacent wall.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 splash and provide a Back Splash Mount Spring Type Pre-rinse Spray; 8" centers dual valve back splash mount, flexible stainless steel hose wrapped with stainless steel support spring with wall bracket to adjacent wall. Complies with April 2007 ―LEEDS for Schools‖ Water Efficiency (WE) Credit 4: Process Water Use Reduction - maximum water use of 1.4 GPM.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 1. (4) sheet pan rack, 20" x 20", holds 4 sheet pans 2. External vent fan control w/adjustable delay timer (exhaust fan by others) 3. Install in a straight thru configuration. 4. Internal detergent & rinse additive dispensing system. B.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 between perpendicular legs of dish table as shown. Angled back splash shall have top return into corner to adjacent walls with a positive slope back onto dishtable. Wall edge of corner filler shall lip down 90o to fit into a wall secured "Z" clip. Front edge shall seal to sloped top of backsplash with no exposed fasteners. 2. At exposed edges of top, provide a 3"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 up vertically 3"H. w/ 1 ½" flat top, turn down 1-1/2". C. Punch the top for and mount the food waste collector per manufacturers recommendations. D. Mount top on standard Open Frame Base. (2) ―H‖ leg sets, one either side of the food waste collector. Each leg set with flanged foot on front leg, set in sealant and securely anchored to the floor.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 3. Backflow prevention required (By Other Trades) ITEM NO. D8 - TRAY DRYING WALL FAN BY ALTERNATE A. By alternate, provide J & D Manufacturing 18" white waterproof fan with wall ceiling mount bracket (available through Global Industrial stock WI968709).
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 18"W. x 48"L. ITEM NO. F1 - WASTE BARREL; 44 GAL W/DOLLY REQUIRED A. Provide Continental model 4444GY Round Huskee Container, general purpose waste, without lid, 44-gallon capacity, 31-1/2" x 24" dia., made of engineered resins, grey, NSF. Provide with the following; 1. Dolly for round Huskee containers, made of engineered resins, 5" x 18" dia.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 D. Provide ½" Pressure Vacuum Breaker; high hazard anti-siphon, anti-spill, pressure type vacuum breaker; rough chrome finish. Provide without Tee handle. 1. Watts 008QT*M112 2. T&S B-0967*M112 3. Fisher 14443 ITEM NO. F3 - DISH TABLE; SOILED ―U‖ REQUIRED A. Provide "U" shaped, as shown on drawing with dish machine leg 100"L. x 30"D.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 F. At the hose reel location; punch the back splash top for the Hose Reel Riser pipe; mount hose reel control below the tray return leg where shown G. Punch the top and install food waste collector per manufacturers recommendations. H. Provide at the staff right end of the silver soak leg, as shown, a standard Dish Table Top integral sink, overall 28"L. x 20"W.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 motor controller in NEMA 4X watertight corrosion resistant enclosure with magnetic contactor, 24 volt Safety Circuitry, line disconnect, start-stop push buttons, run light. 7. Install as shown on the plan. B. Provide dish rack slide bar over top of waste collector. Removable 16 ga. S/S - ½" x 1_1/2" x ½" channel at 19" from the staff side dish table rolled rim.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 wash arms with 14‖ (356mm) wash area ; Slotted, concave wash nozzles and captivated end caps; minimum 14" separation between wash and final rinse arms; synchronized rack rail pawl bar system; side drive system; front-sloping tanks bottoms; fully automatic operation including auto-fill and auto-start; separate compartment actuator switches to ensure wash, recirculat
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 REQUIRED A. Provide as shown on drawing, overall 86"L. x 30"W. x 34"H. from work top to floor. Slope dish table top for positive drainage. B. Construct top in accordance with standard specifications for Dish Table Tops. 1. Standard 8"H. x 2" sloped top back splash at wall. 2. 3"H. x 1-1/2" box rim at exposed sides. 3.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 ITEM NO. F9 - TRAY DRYING WALL FAN REQUIRED A. Provide J & D Manufacturing 18" white waterproof fan with wall ceiling mount bracket (available through Global Industrial stock WI968709). UL507 certified waterproof motor; hanging wall/ceiling yoke bracket to allow tilt angle adjustments; overall 22"L. X 24"W. X 11"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 and plug; R-404A refrigerant with expansion valve control; Two year parts and labor warranty on entire unit; Five year parts warranty on compressor. Energy Star. Provide with the following options in lieu of standard; 1. Casters, 4", set of four - two with brakes (HS-3546) 2. Two Door Foot Pedal (HS-3514) 3.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 8. Where shown, mount food guard specified under a separate Item No. ITEM NO. H3 - DISH CART; 11" ROUND 240 CAPACITY REQUIRED A. Provide Intermetro Industries Corp. Model No. PCD-11*M112 cart 11" dishes; overall 26-5/8"W. x 26-5/8"L x 31-7/8"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 on-off switch; 2. Provide each lamp shade with 100 watt (incandescent comparable) compact fluorescent light bulbs with coated shatter proof bulbs. 3. Track Mount Bar, 4', black, (DL-TRACK-4B) 4. Black electrical drop cord. 5. Custom shade color as selected by architect. 6. Provide cord length to support shade at 60" AFF. ITEM NO. J1 - OVEN - STEAMER ELECT.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 locators; overall 9-3/4"L. x 4-1/4"W. x 1"H. Upward opening channel shaped caster guide constructed of flame regardant thermoplastic resin; able to resist 500 psi direct force; set in sealant and secure to floor per manufacturers recommendations with manufacturer provided floor inserts. C.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 2. With flat top with exposed edges having 1-1/2"x 90 straight turn down with ½" toe-in on 30o angle. B. Open Frame Base, per standards. Provide with standard full length Stationary Undershelf as shown. ITEM NO. J5 - FREEZER; ROLL-IN BY ALTERNATE A. By alternate, provide Traulsen model AIF132LUT-FHS*M112, (1) section roll-in freezer for 66"H. max.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 Twelve (12) universal angle racks for 12" x 20" and 18" x 26" pans of which 10 sets are removable (2 are not) adjustable on 1-1/2" centers, heavy duty 250 5" diameter swivel casters. Equivalent by Beveles. ITEM NO. J8 - WARMER; FRY DUMP STATION BY ALTERNATE A. By alternate, provide Hatco model GRFHS-26*M112 Glo-Ray® Fry Holding Station; overall 26.13"W. X 23.25"D.
4-07058 ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 304 with number 4 finish. Provide the following options; 1. Field measure and coordinate custom length of unit and work shelf with wall supported tray slide as shown. Wall supported tray slide (By Other Trades). 2. 10"H. S/S front apron in lieu of full front panel. 3. 8" extended top depth overhanging staff side; overall top depth of 36.5". 4.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 REQUIRED A. Provide Mod U Serve Elite Service/Self-Service Sneeze Guard ; standard size for a (3) pan hot well unit. High shelf food guard with adjustable awning style front glazing for staff or self serve use.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 construction with 16 gauge S/S formed end panels with top and bottom horizontal members of 16 gauge S/S; 14 gauge S/S top with 2" turndown on all sides and sound deadening applied between top and frame; removable S/S or plastic laminate front panel; 18 gauge S/S steel undershelf with 18" high ends and 4" high back; undershelf is held back 6" from front panel formin
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 A. Design based on Vollrath model 7203107*M112; Cayenne® Twin Well Soup Merchandiser with Menu Board & Variety Graphics; overall 24-9/16"L x 14-9/16"W x 33-1/8"H. Holds (2) 7-1/4 qt. insets; self-insulating wells; cast aluminum element with non-stick coating, 120V, 700W per well, 11.7A, 5-15P plug,, UL, NSF, USA made ITEM NO.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 merchandiser front; ½" dia. stainless steel rod ice agitator bar welded at 45o to ½" stainless steel shaft; positive on/off gate assisted ice delivery; drip tray; front serviceable drain connections and electrical components; limited Two year parts and One year labor warranty. B.
4-07058 ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4. 9.6" Top Cover Extension to 84.5"H. 5. Doors hinged right. 6. Cord exit controls side ITEM NO. M2 - REFRIGERATOR; PASS THRU ONE (1) REQUIRED - ONE (1) BY ALTERNATE 3> FUTURE
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 C. By alternate, provide Winston Products Company Inc. model HA 4522 PT-HR-5 pass thru CVAP holding cabinet; overall 27.6"W. x 36.4"D. x 74.9"H. Hold/Proof Cabinet, CVAP (controlled vapor) technology with independently controlled air and water heaters , mobile, pass-thru, electronic differential control, cap.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 7. Where shown, mount food guard specified under a separate Item No. ITEM NO. N2 - DISH CART; 11" ROUND 240 CAPACITY BY ALTERNATE A. By alternate, provide Intermetro Industries Corp. Model No. PCD-11*M112 cart 11" dishes; overall 26-5/8"W. x 26-5/8"L x 31-7/8"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 Powder coated or gloss vented lamp shade with shade mounted on-off switch; 1. Provide each lamp shade with 100 watt (incandescent comparable) compact fluorescent light bulbs with coated shatter proof bulbs. 2. Track Mount Bar, 4', black, (DL-TRACK-4B) 3. Black electrical drop cord. 4. Custom shade color as selected by architect. 5.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 REQUIRED A. Provide Mod U Serve Elite Service/Self-Service Sneeze Guard ; standard size for a (4) pan hot well unit. High shelf food guard with adjustable awning style front glazing for staff or self serve use.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 high ends and 4" high back. Undershelf is held back 6‖ from front panel forming a utility chase for plumbing and electrical services; top having 12" x 20" individually controlled hot foot wells rated at 1000 watts each with infinite switches. All S/S to be type 304 with number 4 finish. Provide the following options; 1. 10"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 Corners radiused 1". ITEM NO. P4 - 3 PENDANT HEAT LAMPS & CLG TRACK REQUIRED A. Provide Hatco Decorative Heat Lamps model DL-760-CT *M112 cord mount to ceiling light track; shade overall 12 1/2"Dia x 8.5"H. Powder coated or gloss vented lamp shade with shade mounted on-off switch; 1.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 ITEM NO. Q4 - OVEN; ELECTRIC DBL CONVEYOR ONE (1) DECK REQUIRED - 2ND DECK BY ALTERNATE A. Provide Blodgett model MT1828E-Conveyor Oven, Electric, single deck by base bid, double-deck by alternate; overall 50"L. X 35"D. X 60"H (double deck).
4-07058 ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set magnetic catches; (2) locking and (2) non-locking casters; 8' cord set; 120V, 2290W. 1. Door hinged right, as shown. 2. Cord exit rear. ITEM NO. Q7 - TABLE; MOBILE WORK W/ U SHELF REQUIRED A. Provide overall 33"W. x 36"D. x 36" high to work top. Construct top in accordance with standard specifications for Metal Tops. 1. At abacking wall, provide 6"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 ITEM NO. R1 - SERVING UNIT; MOBILE 2 PAN HOT REQUIRED A. Provide Mod-U-Serve Model MCT-HF2-MOD*M112 mobile (2) pan hot well unit - modified length; overall approx. 8'-0"L. X 3'-0 1/2"D. X 3-0"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 A. Hatco Glo-Ray Designer Merchandising Warmer model GR2SDH-54D*M112, overall 60-1/8"W. X 27"D. X 26"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 A. Provide Intermetro Industries Corp. Model No. PCD-11*M112 cart 11" dishes; overall 26-5/8"W. x 26-5/8"L x 31-7/8"H. Non-adjustable molded polymer; (4) columns for maximum 11" diameter dishes; on four (4) B5DN swivel casters (two with brakes); with standard 6-mil protective vinyl cover. Obtain a tray from owner and verify it fits prior to procuring. ITEM NO.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 turnstile arms. Arms: 1.5‖ OD x 16 gauge stainless steel tubing with stainless steel welded cap end. Extended arms extend 20.5‖ from the inside edge of the cabinet. Ratchet Assembly: cast stainless steel and machined, hardened steel parts. Roller Bearing Assembly: Six precision roller bearings that ride on a cast stainless steel cam.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 counter battery has a life expectancy of approximately six years. 5. Computerized Counting Each turnstile rotation outputs a count to Gate Watch, Alvarado‘s Windows based software program that monitors and records real time patron counts.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 comply with the Energy Independence & Security Act of 2007. D. Design layout and overall size of walk-in units as shown on plans and as specified. Shall be overall size 6'-9 ½" wide x 17'-9 3/4" long x 8'-6" high from exterior top to bottom of pre-fab floor. Unit shall be installed on recessed floor/slab furnished by General Contractor, see detail on drawings.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 insulation. Provide 90o angled sections at all corners. Food service contractor shall provide penetrations thru insulated cabinet exterior & is responsible for sealing them. 1. Provide verification, as required by the code authority, that the box complies with the code requirements for use of foam plastic insulation in buildings and structures.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 section. a. If non-heat controlled antisweat heater(s) are used at entry or reach-in door(s), the total door rail, glass and frame heater shall draw no more than 3.0 watts per square foot of door opening (for coolers). b.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 insulated panel. 2. Provide Two (2) bulb fluorescent low temperature interior lighting. Approx. 48"L. X 6-3/8"W. x 4"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 using R-404A. Install compressor, refrigerant piping and refrigerant as specified, hereinafter. See Refrigeration Requirements sub section of this specification section.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 refrigeration system, including all refrigeration specialties and all other parts, devices and accessories required for a complete and properly functioning system, furnished and installed whether or not each item is specifically mentioned in the specifications. ITEM NO. T3 - NOT USED ITEM NO. T4 - SHELVING; EPOXY WIRE BY ALTERNATE A.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 1. Two (2) model 1022, 20"W. x 48"L. x 48"H. ITEM NO. T5C - DUNNAGE RACK; SINGLE TIER BY ALTERNATE A. By alternate, provide New-Age Dunage Racks*M112, constructed with hi-tensil extruded 1-1/2" x 1-3/4" x .070 wall aluminum tube, all heli-arc welded, feet capped, 2,000 to 4,000 lb. average weight capacity, all unit 8"H. Provide model 2015, 24" x 48". ITEM NO.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 ITEM NO. T7 - COMPRESSOR; +35 AIR SCREEN MERCHANDISER BY ALTERNATE A. By alternate, furnish all labor, materials, and equipment for complete installation of air screen merchandiser refrigeration system.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 A. Design based on True Food Service Equipment Inc. model no. G4SM-23-PT*M112 glass door pass thru refrigerator, 23 c.f. capacity; overall all 27-1/2"W. X 32-3/4"D. X 78-5/8"H. Bottom mount compressor; Low-E double pane thermal glass in door, sides and back; N.S.F.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 ITEM NO. U1 - MILK COOLER TWO (2) REQUIRED - ONE (1) BY ALTERNATE A. Provide Mod-U-Serve model MCT-DM3*M112, Double Drop Front Milk Cooler with dual access; overall 64"L. X 30 1/2"D. X 42"H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 ITEM NO. U3 - CASHIERS STAND; RIGHT HAND TWO (2) REQUIRED - ONE (1) BY ALTERNATE A. Provide MOD-U-SERV Model MCT-CRSG-MODM112 Mobile Serving Cash Register Stand, single station; overall 36"H x 27"W x 28.5"D.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 22"W. x 4"H. raised condiment dispensing platform. Platform constructed of 16 ga. S/S. Top punched for San Jamar Frontline condiment pumps and portion cup dispensers. 4. Support the top on an Open Frame Base as detailed. Support the tray slides / lower top on 14ga. S/S channels having vertical 3" outside leg x 8" horizontal leg x 1-1/2" vertical inside leg.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 stainless steel silver cylinders, 4"Dia. x 5-5/8"H. G. Provide on each unit, at each end to the outside of the raised condiment dispensing top, Four (4) Carlisle model 38PD15 vertical condiment dispensers; 5"W. X 10"D. X 15 1/2"H. Stainless steel top loading units with clear plastic front. H.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 Ends shall terminate at operators side in 2" wide vertical mullion. Fully weld flush and polish all seams on face of base front mullions. Body shall have 18 gauge stainless steel bottom and intermediate shelf of stationary construction. Mount cabinet body on 6" Cabinet Legs bolted to 12 gauge stainless steel gussets, which in turn are welded to body.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 polyurethane ;interior incandescent light automatically activated ;die cast legs and stainless steel feet. Door with dbl.
4-07058 ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set indicator light; filtered 24V. solenoid valve with serviceable strainer filter; 120VAC/24VAC plug in transformer; mechanical mixing valve w/ built-in checks and lockable mixing adjustment; (2) 3/8" x 20" long braided supply hoses. C.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 closure; doors stay open at 90 and are self-closing at 85; snap in magnetic door gaskets; door hinging is field reversible ; cylinder door locks are standard.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 and back edge of bases and elevated shelves having designer color insert, color selected by the Architect. With cord and plug. Provide the following options; 1. Breath guards on each shelf on student side. ITEM NO. V9 - CABINETRY; P.L. OPEN BASE BY OTHER TRADES ITEM NO. V10 - DISPENSER NACHO CHEESE BY OWNER ITEM NO.
4-07058 ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 3.1 Installation A. The provider of food service equipment must examine roughed-in mechanical and electrical services, and installation of floors, walls, columns, and ceilings, and other conditions under which food service work is to be installed; verify dimensions of services and substrates before fabricating work.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 3. 4. 5. 6. 7. 8. 9. 3.2 4-07058 packaging, papers and films removed. All sealants & sound deadening applied. All plumbing, mechanical & electrical connections completed. All operational equipment has been turned on and tested for operation. All cleaned of dirt/dust/debris and fabrication markings.
ACI/Frangkiser Hutchens Architects Liberty "North" Second High School Liberty Public School District #53 Building Construction Bid Set 4-07058 manufacturer's recommendations. The food service equipment provider, with his own personnel or those of a service agency, shall turn on and test all functions of each item of operational equipment, PRIOR TO THE SUBSTANTIAL COMPLETION PUNCH LIST AND OWNER DEMONSTRATION, to assure that it is operating properly, and that controls and safety devices are functioning.