Specifications
QUICK START-UP PROCEDURE 
1.  Flush inlet water line thoroughly before connecting. If pipe sealant is necessary, Teflon tape is commended. 
2.  Connect water line to the 1/4" flare fitting located at rear of the unit. A shutoff valve in the water supply line is advisable. 
3.  Turn on water. Check water line and fittings for leaks. 
4.  Put HEATER Switch OFF. 
5.  Plug the power cord into a grounded 120 volt, 60 Hz 15 Amp outlet. Single use. It will take 2 to 4 minutes to fill the tank. 
6.  Put RINSE Switch ON. 
7.  Press Dispense Button until water flows out of the dispense nozzle ( 6 to 7 min.). Tank will fill up. 
8.  PUT RINSE Switch OFF. 
9.  Put HEATER Switch ON and allow 10 to 15 minutes for water to reach brew temperature. 
10.  Fill hopper with DRY* powdered product, while waiting for water in tank to heat up. See filling instructions. 
11.  Push Dispensing Button and check the operation of the hopper. A grinding noise will be heard if not properly engaged. 









