Specifications

JCM Part No. 960-000058R_Rev. 2 © 2008, JCM-American Corporation
Installation / Operation EBA-03 Bill Validator Section 2
DIP Switch Settings
The EBA-03 has two sets of DIP Switches. One is
located on the right side of the acceptor
(See Figure 2-2 a), designated DIP Switch Block 1
(DS-1), the other is inside the EPROM cover
(See Figure 2-2 b), designated DIP Switch Block 2
(DS-2).
DIP Switch Block 1 (DS-1) is used to accept or
in
hibit
denominations. DIP Switch Block 2 (DS-2)
is used to select the interface (I/F) and set details of
the interface signals.
DS-2 can be accessed by removing the EPROM
cov
er.
These DIP Switches are used to set serial or
pulse interface, and establish signal parameters if
the Pulse Interface is used.
Table 2-4 Pulse I/F (ID-003) Pin Assignments
Pin No. Signal Name I/O Active Description
1 Vdd Input Power supply 12V (±5%)
2 Vss GND
3 VEND Output Low Bill acceptance denomination signal
4 NC Leave unconnected
5 Vss GND
6 Vcc Output Power supply 5V (±5%) MA
X 20mA
7 BUSY Output High Output signal when validator is functional
8 INH Input High
Bill acceptance inhibition signal
*
9 ABN Input High Output signal when validator is abnormal
10 NC Leave unconnected
*.When an INH signal is not connected, the acceptor is in a bill acceptance inhibition mode.
When an INH signal is not used, connect pin 8 to Vss.
CPU Board
9 1
10 2
Figure 2-2 Various DIP Switch Locations
a
b
DS-1 Switch Location
DS-2 Switch Location
Table 2-5 DIP Switch 1 (DS-1) Settings
DIP Switch
No.
Position
Denomination
(see NOTE below)
*
Accept/
Reject
ON OFF
2
X
1
Accept
X Reject
3
X
2
Accept
X Reject
4
X
3
Accept
X Reject
5
X
4
Accept
X Reject
6
X
5
Accept
X Reject
7
X
6
Accept
X Reject
Caution: Make all DIP Switch settings
with the power to the EBA-03 turned
OFF!
NOTE: Turn DS-1, Switch #1
ON to enter the test mode.