Specifications
16
• Push the open end of the supplied blue hose into water inlet
of the filter (The direction arrows on the top filter moulding
should point TOWARD this fitting), this should lock into
position.
• Screw the ⅜”BSP fitting end of the blue hose onto the cold
water inlet of the reservoir/heater unit (this is the connection
with the blue collar).
• Ensure all connections are securely tightened, that hoses
are not stretched or kinked and that all hoses are safely
supported, before turning on the water supply.
Priming the installation
• Open all installed water valves to allow water to flow to the 3 in 1
instant hot water tap.
• Turn the spring-back hot water tap handle against its spring and
hold there for approx. 90 seconds to prime the reservoir.
• When the reservoir is full, water will flow from the 3 in 1 instant hot
water tap spout.
• Allow the hot water handle to spring back to its rest position then
check all connections for water tightness and absence of leaks.
• Any leaking joint must be tightened and the surrounding area dried
before connecting the power supply.
Only connect the electricity supply to the reservoir/heater unit at
this stage: Insert the plug into its socket and switch on.










