Specifications

• Then check to see if any of the feet are not
touching the floor or touching the floor only
loosely. If so, bring foot down to just touch floor.
• Place Level front to back on right side of table and
adjusting Leveling Bolts in each of the right front &
rear feet as required, until table base is within
0,0003 m/m.
• Re-check and adjust any feet that are loose or not
touching, until they just touch the floor.
• Repeat for left side of table.
• Re-check and adjust any feet that are loose or not
touching, until they just touch the floor.
• Move to front of table and check front of table left
to right for level. Adjusting Leveling Bolt in which
ever of the feet is lowest as required, until table
base is within 0,0003 m/m.
Adjust center Leveling Bolts at front of table until
it just touches the floor.
• Move to rear of table and check rear of table left
to right for level. Adjusting Leveling Bolt in which
ever of the feet is lowest as required, until table
base is within 0,0003 m/m.
NOTE: In most cases the lowest foot should be on the
same side in the rear as the one that was just adjusted
on the front of the table.
Adjust center Leveling Bolts at rear of table until it
just touches the floor.
• Recheck table front to back and left to right.
• Tighten Jam Nuts on all the feet to lock bolts in
place.
After leveling Table Base using by adjusting the
feet; place shims under table base wherever the base
is not in direct connect with the floor.
NOTE: This is very important. If Table Base is not
supported it may bowl when the weight of the fixture
and workpiece are installed.
9. ATTENTION - Remove steel Cross Bracket that
supports machine during shipping (
see Figure 1-4).
10. ATTENTION - Remove Wooden Support, added
to Machine to restrict movement of Column during
transit (
refer Figure 1-4).
11. ATTENTION - Raise Column. Remove steel
Shipping Bracket located behind carriage Linear Rails
Cover and install stainless cover (
refer Figure 1-4).
12. ATTENTION - Remove bubble wrap from under
Stroker Motor on base of column and remove
protective wrap from cover (
refer Figure 1-4).
13. ATTENTION - The Cable Track has been
disconnected from column for shipping purposes.
Reattach Cable Track to top of column using bolt
and washer supplied (
see Figure 1-5).
2
FIGURE 1-3, Leveling Bolts
FIGURE 1-4, Shipping Brackets
MILLWRIGHT’S
LEVEL
JAM NUT
LEVELING
BOLT
FIGURE 1-5, Cable Track
CABLE
TRACK
AT TACH
HERE
CROSS
BRACKET
COVER
SHIPPING
BRACKET
BUBBLE
WRAP
WOODEN
SUPPORT
SHIM
SHIM
SHIMS