Specifications
GENERAL
Consult this section when unpacking, inspecting,
and installing Sunnen
®
Vertical Honing Machine
(
see Figure 1-1). Hereafter referred to as the machine.
TOOLS & MATERIALS
The following tools and materials are required for
unpacking and installing of your Machine:
Knife Hex Wrenches
Hammer Open End Wrenches
Crow Bar Cleaning Solvent
Tin Snips Screwdriver (Std)
Slip Joint Pliers Forklift
INSTALLATION
Read the following instructions carefully and
thoroughly before unpacking, inspecting and
installing your Machine. All references to right and
left in these instructions are, unless otherwise noted,
as seen by operator as one looks at Machine or
assembly being described (
refer to Figure 1-1).
NOTE: When ordering parts for, or requesting
information about your Machine, include Model and
Serial Numbers printed on Nameplate.
1. Move Machine to staging/unpacking area.
2. Remove shipping carton and plastic wrap. (Cut,
remove and discard shipping bands.)
3. Remove all loose components.
4. Check all components against packing list.
5. Inspect Machine and components for dents,
scratches, or damage resulting from improper handling,
by carrier. If damage is evident, immediately file a
claim with carrier.
CAUTION
Weight is approx. 4350 kg (9590 lb).
6. Remove Bolts securing Machine to Skid.
7. Using a forklift remove machine from skid and
move to desired location and lower into place (
see
Figure 1-2
).
NOTE: Machine should be located on a leveled
concrete floor away from heavy traffic. Allow at least
1m (38in.) around enclosure to any adjacent equipment
and walls. Refer to Figure 1-A, Floor Plan Layout.
8.
Level and stabilize Machine by placing a millwright's
level on ground Table Base (see Figure 1-3). Machine
needs to leveled both from front to back and left to
right.
NOTE: Machine does not need to be bolted to floor but
should be set on 1/2" thick steel pads.
• Begin by screwing ALL six (6) Adjustable Feet all
the way into the Table Base (until table base is resting
on the floor).
1
FIGURE 1-1, Vertical Honing Machine
FIGURE 1-2, Fork Lift
RIGHT
FRONT
LEFT