Specifications

OPERATIONAL CHECK
Read Sections 1, 2 and 3 thoroughly and carefully
before performing the Operational Check.
NOTE: Power up and start machine to check for
proper operation.
1. Release E-STOP and press POWER ON Button.
NOTE: When machine is powered up it should open
the “Sunnen” software.
2. Once machine is through initializing, press “F1
Setup Menu.
3. Then press “F2 Install Setup,” and follow
directions on display screen.
4. Once a setup is install; at Main Menu press “F2
Run Menu.
5. In run settings you can toggle the coolants lines
to check the rotation of the Sump Pump Motor.
(Rotation of Shaft should be as shown on Motor
Cover.)
6. If rotation is incorrect, turn OFF power to
Machine and reverse any two wires (red, white, or
black) of electrical supply cord, where they connect
to Disconnect Block.
7. Operate Machine and check rotation of optional
equipment according to Installation Instruction
package with optional equipment.
8. Set up and test all machine functions
(refer to
Section 3)
.
9. After unpacking and installing Machine, clean
and lubricate
(refer to Section: 4, Routine
Maintenance)
.
5