User`s guide
Installing the CDA 7 5330 with Microcode Release 5264
77 A7 48UU Rev03 E-3
E.3 Installing the CDA 7 on a Host System
Two ways are possible:
• Installation of a CDA 7 subsystem in an existing configuration. This case is
described hereafter.
• Installation of a CDA 7 subsystem delivered with a new system. For more
information, refer to the On-Line Help of the BUILD P2 command of FGF.
E.3.1 Unpacking the CDA 7
Two packages are delivered on pallets:
• the first package contains the subsystem (the largest package).
• the second package contains:
− the modem and its power supply
− the documentation
− tools and miscellaneous cables
You will find two self-adhesive envelopes on the main cardboard box containing:
• depalletizing instructions
• a sheet with the serial numbers of the cards and disks delivered (keep this sheet)
Contents of the second package
There are the following main elements:
• the AC power source cable for the subsystem
• the modem connection cable
• a media box (MICROCODE) The media box must be present on the site.
• a 5/16 hexagonal spanner
• a small insulated screwdriver (for handling rotactors)
• a plastic tool (for card resets)
• a spanner with expansion rod to access connection nuts
• a black/red connection cable used as extension cable if the battery is taken out of
the cabinet
• loopback connectors for Bus&Tag cables
• an antistatic bracelet










