Operating instructions
Preventive Maintenance Manual
128 Copyright © 2012 EVG
Figure 129 - EVG Polish Procedure
4) After 20 circles clean up chuck insert and stone again with IPA.
Repeat the steps above 10 times.
6.2.3 Maintenance Frequency
6.2.3.1 Bond Chuck
The bond chuck maintenance has to be done once every 50 bonds:
Figure 130 - Bond Chuck
335 of 370