Operating instructions

Preventive Maintenance Manual
126 Copyright © 2012 EVG
6 Quarterly Maintenance
6.1 Checking Bond module and chuck
Make a visual check of the Bond tool and the chuck. There should be
no crack or spot detectable. The surface must be flat.
6.2 Chuck Polish Check
6.2.1 Polish Bond Chuck Insert (Backside)
Use EVG polishing tool (Arkansas stone) for maintenance procedure:
Figure 126 - EVG Polish Tool
1) Clean the backside of the bond chuck insert with IPA.
2) Clean polishing tool with IPA.
3) Polish the surface with the tool by sliding the stone in a circular
movement (see below).
333 of 370