Operating instructions

Monthly Maintenance
Copyright © 2012 EVG 117
5
5
5.17.3 Cooling Time
Check the Cooling Time of the system.
1) Load bond chuck with wafer into chamber
2) Close chamber
3) Evacuate till 5mbar
4) Fill chamber with N2
5) Piston Down with low force (appr.1000N)
6) Heat chamber till 400°C with both heaters if the max. temperature
of the system is 550°C. If the temperature of the system is limited
<400°C use the max. temperature limit for this test, i.e.: 200°C,
250°C.
7) Wait 5min
8) Activate top (if equipped) - and bottom side cooling
9) Test ends when temperature reaches 100°C on both heaters
according to chamber TCs.
Note: For the Cooling Time refer to the Cooling Performance Specification
according to the Acceptance Test Protocol.
324 of 370