Operating instructions
Monthly Maintenance
Copyright © 2012 EVG 105
5
5
5.9 Safety Valve
To check the function of the safety valve, increase the pressure on the
purge gas regulator.
The safety valve must open at:
2bar – 6 and 8inch Bond Chamber
1,3bar – 12inch Bond Chamber
Adjusting the safety valve (only Safety valve SS-RL3M4F4-RT2,1bar
SS – 10008714; 6 and 8inch Bond Chamber):
1) Set the pressure on the purge gas regulator to 2,1bar
Figure 114
2) Rotate the cap nut until pressure is released from the baffle
3) Rotate the cap nut back until no pressure is released
4) Lock the cap nut
312 of 370