Operating instructions

Preventive Maintenance Manual
92 Copyright © 2012 EVG
3) Put the Load Cells into the chamber (use the adjustment plate) and
thread the cables below the hole in the cover as shown in the
picture below.
Figure 93
Note: If necessary fix the Load Cells with some tape.
1
2
299 of 370