Technical data
30
Warning:
If it becomes necessary to RESET the software program, it will
be essential to repeat all steps listed above. This will ensure that
the correct amount of water enters the chamber for operation.
VERY IMPORTANT – Due to the fact that the water lines are
empty when the unit is shipped, air may become trapped in the
lines. It is recommended that for the first operation these steps
are followed to make sure water is flowing freely.
Open the door, press the Water Inlet key. When water enters the
chamber, release the key and remove the water.
6.3 Lifting and Carrying
Caution:
Before moving the autoclave, make sure that the electric cord is
disconnected from the power and there is no pressure in the chamber.
1. Disconnect the power supply cord.
2. Drain the water from the reservoir and vessel.
To avoid injuries, lifting and carrying should be done by two people.
Do not drop this device!
6.4 Loading and Unloading the Device
6.4.1 Safety
Protective equipment, clothes and other safety instructions should
be implemented in accordance with local and national regulations
and/or rules!
For proper sterilization - Do not overload the chamber. Only
autoclavable products shall be used; please refer to the materials
or instruments manufacturers instructions for sterilization of
unknown materials or instruments.
6.4.2 Loading
Correct loading of the autoclave is essential to successful
sterilizing for several reasons. Efficient air removal from the
chamber and the load will permit steam penetration and
saturation, and allow proper drainage of condensate. Additionally,
correct loading will reduce damage to packs and
their
contents
and
maximize
efficient use of the sterilizer.
For detailed loading instructions, see sec. 7 (Preparation before
sterilization).
6.4.3 Unloading
On completion of the cycle, the load shall be immediately
removed from the sterilizer and a visual inspection made to
ascertain that the load is dry, and that sterilizing indicators have
made the required color change.