User manual - Chapter 2 Scheduler

50
To Do Data Screen
3
4
1
2
5
6
7
8
9
To check and uncheck the item
Tap the check box to toggle it between being checked and unchecked. The
date checked is added automatically.
The check boxes of all unchecked data items whose due dates are passed
are replaced by exclamation points (
).
To change the priority
Tap the current priority to cycle it in the following sequence:
A B C A, etc.
1 Priority
2 Check box
3 Description
4 Data display tool bar
5 Date checked
6 Category
7 Due date
8 Alarm date
9 Alarm time