User manual - Chapter 2 Scheduler
50
To Do Data Screen
3
4
1
2
5
6
7
8
9
To check and uncheck the item
Tap the check box to toggle it between being checked and unchecked. The
date checked is added automatically.
• The check boxes of all unchecked data items whose due dates are passed
are replaced by exclamation points (
).
To change the priority
Tap the current priority to cycle it in the following sequence:
A fi B fi C fi A, etc.
1 Priority
2 Check box
3 Description
4 Data display tool bar
5 Date checked
6 Category
7 Due date
8 Alarm date
9 Alarm time