Software versión 2.02 Guía del usuario
ε-53
Calling E-Con2 Functions from an eActivity
• To execute sampling from an Econ Sampling strip 
1.  On the eActivity workspace screen, use the f and 
c keys to move the highlighting to the Econ Sampling 
strip. 
2. Press w.
• This displays a sampling start confirmation screen. 
• If this is the first time you are using this Econ 
Sampling strip for sampling, continue on to step 3. 
• If this is an Econ Sampling strip that you have used 
for sampling in the past and want to re-execute with 
the same setup, jump to step 8. 
3. Press !,(,) to display the application list. 
4. Use the f and c cursor keys to move the highlighting to “Econ AdvancSetup”, and 
then press w.
• This displays the Advanced Setup screen. 
5.  Perform steps 4 and 5 under “To configure an EA-200 setup using Advanced Setup (page 
ε-8) to configure the setup for sampling. 
6. Press !,(,) to display the application list. 
7. Use the f and c cursor keys to move the highlighting to “Econ Sampling”, and then 
press w.
• This will return to the sampling start confirmation screen in step 2 of this procedure. 
8. Press w.
• This will set up the EA-200 in accordance with the setup data registered in the Econ 
Sampling strip. The message “Start sampling?” appears on the screen after EA-200 set 
up is complete. 
9. Press w to start sampling. 
• The screens that appear while sampling is in progress and after sampling is complete 
depend on setup details. For more information, see “Starting a Sampling Operation” 
(page 
ε-30). 
• After sampling is complete, the data will be graphed in accordance with the setup 
settings. 
10. To return to the eActivity workspace screen from the graph screen, press !a('). 
20111101










