ASSEMBLY AND INSTALLATION INSTRUCTIONS w ARN AVOID RISK OF ELECTRICAL SHOCK, BE SURE TO SHUT OFF s POWER BEFORE INSTALLING OR SERVICING THIS FIXTURE. NOTES: 1. Before installing, consult local electrical codes for wiring and ground requirements. C0226 2. READ AND SAVE THESE INSTRUCTIONS. Hardware Packages (included): 1] s Mounting Pate (A) Mounting Screw (B) Wire Connector (C) gr::: B =:/m Lock Nut (F) Pall Nut (G) Installation Steps Turn off the power at fuse or circuit box. 1.