Specifications

3
CONTENTS (cont)
Page
Power Up the Controls and Check the
Oil Heater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Software Configuration . . . . . . . . . . . . . . . . . . . . . . . . . 59
Input the Design Set Points . . . . . . . . . . . . . . . . . . . . . 59
Input the Local Occupancy Schedule
(OCCPC01S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Input Service Configurations. . . . . . . . . . . . . . . . . . . . 59
PASSWORD
INPUT TIME AND DATE
CHANGE ICVC CONFIGURATION IF NECESSARY
TO CHANGE THE PASSWORD
TO CHANGE THE ICVC DISPLAY FROM ENGLISH
TO METRIC UNITS
MODIFY CONTROLLER IDENTIFICATION
IF NECESSARY
INPUT EQUIPMENT SERVICE PARAMETERS
IF NECESSARY
MODIFY EQUIPMENT CONFIGURATION
IF NECESSARY
Perform a Control Test . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Pressure Transducer and Optional Flow
Device Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
ZERO POINT CALIBRATION
HIGH END CALIBRATION
Check Optional Pumpout System
Controls and Compressor. . . . . . . . . . . . . . . . . . . . . 62
High Altitude Locations . . . . . . . . . . . . . . . . . . . . . . . . . 62
Charge Refrigerant Into Chiller . . . . . . . . . . . . . . . . . . 63
CHILLER EQUALIZATION WITHOUT A
PUMPOUT UNIT
CHILLER EQUALIZATION WITH PUMPOUT UNIT
CHILLER SHIPPED WITH HOLDING CHARGE
TRIMMING REFRIGERANT CHARGE
INITIAL START-UP. . . . . . . . . . . . . . . . . . . . . . . . . . . . .64,65
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Check Oil Pressure and Compressor Stop . . . . . . 65
To Prevent Accidental Start-Up. . . . . . . . . . . . . . . . . . 65
Check Chiller Operating Condition . . . . . . . . . . . . . . 65
Instruct the Customer Operator . . . . . . . . . . . . . . . . . 65
COOLER-CONDENSER
OPTIONAL PUMPOUT STORAGE TANK AND
PUMPOUT SYSTEM
COMPRESSOR ASSEMBLY
COMPRESSOR LUBRICATION SYSTEM
CONTROL SYSTEM
AUXILIARY EQUIPMENT
DESCRIBE CHILLER CYCLES
REVIEW MAINTENANCE
SAFETY DEVICES AND PROCEDURES
CHECK OPERATOR KNOWLEDGE
REVIEW THE START-UP, OPERATION AND
MAINTENANCE MANUAL
OPERATING INSTRUCTIONS . . . . . . . . . . . . . . . . . 66-68
Operator Duties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Prepare the Chiller for Start-Up . . . . . . . . . . . . . . . . . 66
To Start The Chiller. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
Check the Running System . . . . . . . . . . . . . . . . . . . . . 66
To Stop the Chiller . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
FAILURE TO STOP
After Limited Shutdown . . . . . . . . . . . . . . . . . . . . . . . . . 66
Preparation for Extended Shutdown . . . . . . . . . . . . 66
After Extended Shutdown . . . . . . . . . . . . . . . . . . . . . . . 67
Cold Weather Operation. . . . . . . . . . . . . . . . . . . . . . . . . 67
Refrigeration Log . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
PUMPOUT AND REFRIGERANT TRANSFER
PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69-72
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Page
Operating the Optional Pumpout Unit . . . . . . . . . . . 69
Chillers with Storage Tanks . . . . . . . . . . . . . . . . . . . . . 70
TRANSFER REFRIGERANT FROM PUMPOUT
STORAGE TANK TO CHILLER
TRANSFER REFRIGERANT FROM CHILLER TO
PUMPOUT STORAGE TANK
CHILLERS WITH ISOLATION VALVES
DISTILLING THE REFRIGERANT
GENERAL MAINTENANCE . . . . . . . . . . . . . . . . . . . .72,73
Refrigerant Properties . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Adding Refrigerant. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Removing Refrigerant. . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Adjusting the Refrigerant Charge . . . . . . . . . . . . . . . 72
Refrigerant Leak Testing . . . . . . . . . . . . . . . . . . . . . . . . 72
Refrigerant Leak Rate . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
Test After Service, Repair, or Major Leak . . . . . . . . 72
REFRIGERANT TRACER
TO PRESSURIZE WITH DRY NITROGEN
Repair the Refrigerant Leak, Retest, and Apply
Standing Vacuum Test . . . . . . . . . . . . . . . . . . . . . . . . 73
Trim Refrigerant Charge. . . . . . . . . . . . . . . . . . . . . . . . . 73
WEEKLY MAINTENANCE. . . . . . . . . . . . . . . . . . . . . . . . 73
Check the Lubrication System . . . . . . . . . . . . . . . . . . 73
SCHEDULED MAINTENANCE . . . . . . . . . . . . . . . . 73-78
Service Ontime. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
Inspect the Control Center . . . . . . . . . . . . . . . . . . . . . . 73
Check Safety and Operating Controls
Monthly . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
Changing Oil and Oil Filter . . . . . . . . . . . . . . . . . . . . . . 73
Oil Specification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Oil Heater . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Refrigerant Filter/Drier . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Oil Strainers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
VFD Refrigerant Strainer . . . . . . . . . . . . . . . . . . . . . . . . 74
Vaporizer Refrigerant Return Line Orifice . . . . . . . 74
Compressor Inlet Bearing Oil Orifice . . . . . . . . . . . . 74
Inspect Condenser Refrigerant Float System. . . . 75
Inspect Relief Valves and Piping . . . . . . . . . . . . . . . . 77
Compressor Bearing Maintenance . . . . . . . . . . . . . . 77
Compressor Rotor Check . . . . . . . . . . . . . . . . . . . . . . . 77
Motor Insulation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Inspect the Heat Exchanger Tubes . . . . . . . . . . . . . . 77
•COOLER
CONDENSER
Water/Brine Leaks. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Water/Brine Treatment . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Inspect the Control Center . . . . . . . . . . . . . . . . . . . . . . 77
Recalibrate Pressure Transducers . . . . . . . . . . . . . . 78
Optional Pumpout System Maintenance. . . . . . . . . 78
OPTIONAL PUMPOUT COMPRESSOR
OIL CHARGE
OPTIONAL PUMPOUT SAFETY
CONTROL SETTINGS
Ordering Replacement Chiller Parts. . . . . . . . . . . . . 78
TROUBLESHOOTING GUIDE . . . . . . . . . . . . . . . . 78-117
Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
Checking Display Messages . . . . . . . . . . . . . . . . . . . . 79
Checking Temperature Sensors . . . . . . . . . . . . . . . . . 79
RESISTANCE CHECK
VOLTAGE DROP
CHECK SENSOR ACCURACY
DUAL TEMPERATURE SENSORS
Checking Pressure Transducers . . . . . . . . . . . . . . . . 79
COOLER CONDENSER PRESSURE TRANSDUCER
AND LIQUIDSIDE FLOW DEVICE CALIBRATION
TRANSDUCER REPLACEMENT