Specifications

7
4) Make sure that the lift is level in all directions and weight should be
shared equally by all four threaded mounting rods.
5) Bottom of the lift must be unobstructed after installation.
3. Installing at ceiling
CAUTION:
It is installer’s responsibility to make sure that the ceiling structure can
support at least FOUR times the total weight of the lift and the
projector. Reinforce the structure as required before installing the lift.
1) The lift should be supported by four M10 or 3/8 threaded mounting rods
spaced at 160 mm wide x 100 mm depth. The length of the rods may
vary depend on the height of the ceiling.
2) No mounting material is provided. Please use suitable type of anchors and
fasteners base on the ceiling type.
3) The threaded rods must pass through the mounting holes and secure by
nuts above and below.
4) Please adjust threaded rods length to get proper height.
5) Use threaded compound angle nuts to prevent swinging.
6) Please check that the lift is level from front to back and side to side.
7) A minimum opening of 485mmWx485mmD is required on false ceiling
for the lift to travel.