Xtension Lift Model: AC-310 AC-510 Installation Instructions 0
XTENSION LIFT INSTALLATION INSTRUCTIONS Please read installation instructions carefully before installation and keep it for future reference. INDEX: Important Safety Instructions………………………………………….….….2 X tension Lift Overview…………………..…………….…..………..............3 Specifications………………………………………………………............... 4 Dimensions…………………………………………………………….......…5 Installation Instructions 1. Preliminary Checking……………………………………………...…...6 2. Guidelines for Installations…………………………………………..... 6 3.
Installation and Operation Manual This manual explains how to install, operate and maintain the Xtension Lift for video projector. This manual is for installer, interior designer, architect, M&E consultant and system integrator who has known about XLT Xtension lift. IMPORTANT SAFETY INSTRUCTIONS WARNING: FAILURE TO FOLLOW ALL THE FOLLOWING INSTRUCTIONS CAN RESULT IN SERIOUS PERSONAL INJURY OR DAMAGE TO EQUIPMENT. CAUTION 1) The lift is not for outdoor use.
) Clear all persons and obstructions along the lift travel path while it is operating or in service. 5) Watch the moving projector lift and keep people away until the projector lift is completely closed. 6) Please do not close the lift while the projector is running or while it is in “cool down” operation to avoid premature failure of electrical or electronic components. 7) Please do not step on the lift or cage. Overloading could lead to damage of equipment or injury.
Mounting hole ( Mount to the ceiling) Ceiling Mounting Plate DOWN Limit Positioner Aluminium Profile UP limit Positioner Projector tilting kit Detachable Cage Ceiling Cover Specification: Model AC 310 AC 510 Dimension (W x D) Height in Closed Position (w/o cage) Max. Weight Capacity 210mmx150mm 210mmx150mm 530mm 730mm 20 kg 20 kg Voltage Single Phase 230VAC50 Hz Single Phase 230VAC 50 Hz Rated Current 0.2 A 0.2 A Power Consumption 45 W 45W Max. Travel Distance Max.
Dimensions 5
Installation Instructions PLEASE ENGAGE LOCAL PROFESSIONAL INSTALLER TO PERFORM INSTALLATION. PLEASE ALWAYS FOLLOW LOCAL BUILDING CODES, ELECTRICAL CODES AND LOCAL LAWS. 1. Preliminary Checking: 1) The ceiling structure should support at least FOUR times the total weight of the lift and projector. Please reinforce additional supporting structure if needed. 2) Please check the overall dimensions of the lift and ensure that there is sufficient space above ceiling before installation.
4) Make sure that the lift is level in all directions and weight should be shared equally by all four threaded mounting rods. 5) Bottom of the lift must be unobstructed after installation. 3. Installing at ceiling CAUTION: It is installer’s responsibility to make sure that the ceiling structure can support at least FOUR times the total weight of the lift and the projector. Reinforce the structure as required before installing the lift.
4. Detachable Cage Assembly Exploded view of detachable cage Top Cover Mounting hole to attach projector Back cover Projector bracket Side Cover Ceiling Cover 1) Fix left and right side cover to the ceiling cover frame.
2) Fix the top cover to two side covers. 3) Install the projector to the projector mounting bracket. Please follow the projector manufacturer’s instructions. 4) Attach the projector mounting plate to the bridge at the top cover.
5) Please fix the back cover to two side covers. 6) Attach the cage to the ceiling mounted lift.
5. Connecting to Power Supply NOTE: All electrical wiring required for installation should be done by qualified electrical technician.
1) Please refer wiring diagram shown below.
6. Setting the travel limit NOTE: Please set the DOWN limit before setting UP limit. 2) To set DOWN limit (show position), (i) (ii) (iii) Lower down the lift to the operating position with projector turned on. Loosen the screws of the DOWN limit positioner and slide it downward until it touch the limit stopper. Re-tighten the screw. Concrete Ceiling Threaded Rods DOWN Limit Positioner UP Limit Positioner False Ceiling Fig.
3) To set UP limit (store position), (i) Bring the lift up to the store position or flush with the ceiling board. (ii) Loosen the screws of the UP limit positioner and slide it upward until it touch the limit stopper (iii) Re-tightened the screw. Concrete Ceiling Threaded Rods (x4) Down Limit Positioner UP Limit Positioner False Ceiling Fig. Setting UP limit 4) Please operate the lift UP and DOWN to counter check the limit setting.