INSTALLATION
Step l--Check Equipment and Job Site
UNPACK UNIT
Move to final location. Remove carton, taking care not to dmnage
unit.
INSPECT EQUIPMENT
File claim with shipping company prior to installation if shipment
is damaged or incomplete.
Step 2--Install on a Solid, Level Mounting Pad
It"conditions 02"local codes require the unit be attached to pact, tie
down bolts should be used and fastened through knockouts
provided in unit base pan. Refer to unit mounting pattern in Fig. 3
to detemfine base pan size and knockout hole location.
On rooftop applications, mount on level platform or frame. Place
unit above a load-bearing wall and isolate unit and tubing set fi'om
structure. Arrange supporting members to adequately support unit
and minimize transmission of vibration to building. Consult local
codes governing rooftop applications.
3/8-1N DIA TIEDOWN
KNOCKOUTS IN BASEPAN
(2) PLACES
VIEW FROM TOP
3/16"
A97548
MINIMUM
TIEDOWN KNOCKOUT
MOUNTING PAD
UNIT SIZE DIMENSIONS LOCATIONS
Support Feet Snow Stand A B
024 19 X 24 26 X 32 2-!3/16 6-15/16
036-060 26 X 32 3! X 35 4 9-3/4
Fig. 3--Mounting Unit to Pad
On rooftop applications, locate unit at least 6 in. above roof
surface.
Step 4_Operating Ambient
The minimum outdoor operating ambient in cooling mode is 55°F,
and the maxinmm outdoor operating ambient in cooling mode is
125°F.
Step 5--Elevate Unit
Accumulation of water and ice in base pan may cause
equipment damage.
Elevate unit per local climate and code requirements to provide
clearance above estimated snowfall level and ensure adequate
drainage of the unit. Fig. 4 shows unit with accessory support feet
installed. Use accessory snow stand in areas where prolonged
freezing temperatures are encountered. Refer to separate Installa-
tion Instructions packaged with accessories.
Do not allow POE lubricant to come into contact with roofing
material. POE may deteriorate certain types of synthetic
roofing.
NOTE: Unit must be level to within ±2 ° (±3/8 in.ift).
Step 3--Clearance Requirements
When installing, allow sufficient space fbr airflow clearance,
wiring, refrigerant piping, and service. Allow 30-in. clearance to
service end of unit and 48 in. above unit. For proper airflow, a 6-in.
clearance on 1 side of unit and 12 in. on all remaining sides nmst
be maintained. Maintain a distance of 24 in. between units.
Position so water, snow, or ice from roof or eaves cannot Pall
directly on unit.
Fig. 4_Accessory Support Feet
A98533