Product data

START-UP - Satellite Units
Make the following checks and complete the Start-Up Checklist before system start-up. Refer to outdoor unit
Installation, Start-Up, and Service manual for system start-up instructions and refrigerant charging methods. Be
sure to use the system refrigerant charge shown in Section #4 or #14 or on the outdoor unit nameplate.
1. Check condensate drainage system to ensure the condensate line is securely fastened and insulated.
2. Make sure that all wiring connections are correct and that they are tight.
3. Make sure that all barriers, covers, and panels are in place.
4. Ensure that the filters and return air grilles have been installed and correctly positioned.
WARNING:
Never operate unit without a filter or with grille(s) removed. Damage to the unit or personal in
jury may result.