Specifications
13
Application data, mounting arrangement
Unit levelling
Typical isolation Standard isolation
Support
plate
Elastomeric
pad
Jacking
screw(s)
Soleplate
Level
pad(s)
standard
isolation
Accessory
soleplate
package - levelling
Isolation with isolation package only (standard)
1. Support plate
2. Machine foot
3. 10 mm level base line
4. Shear flex pad (10 mm)
Note: Isolation package includes 4 shear flex pads.
Accessory soleplate detail - levelling
Machine foot
Level base line
35 mm
Levelling pad
Support plate
See note (1)
25 mm HRS
soleplate
See note (3)
Floor line
Jacking screw
See note (2)
Notes:
1. Accessory soleplate package includes 4 soleplates,
16 jacking screws, leveling pads and shear flex pads.
2. Jacking screws to be removed after grout has set.
3. Thickness of grout will vary, depending on the amount
necessary to level chiller. Use only pre-mixed non-
shrinking grout, Celcote HT-648 or Master Builders
636, 38 to 57 mm thick, or equivalent.