Operating instructions

29
11. Cooling tower fan starter
12. To cooling tower
13. From cooling tower
14. To load
15. From load
16. Drain
Piping
Control wiring
Power wiring

IMPORTANT: Ensure correct phasing is followed for
proper motor rotation (clockwise). Do not isolate the
terminals until the wiring has been verified and approved
by the Carrier personnel in charge of the commissioning.
NOTE: The oil pump disconnect switch can be placed
near element 2, (separate starter cabinet).
1. Disconnect
2. Unit mounted starter with control (factory-installed)
3. Guide vane motor
4. Oil pump terminal box
5. Vents
6. Pressure gauges
7. Chilled water pump
8. Condenser water pump
9. Chilled water pump starter
10. Condenser water pump starter
NOTES:
1. Wiring and piping shown are for general point-of-
connection only and are not intended to show details
for a specific installation. Certified field wiring and
dimensional diagrams are available on request.
2. All wiring must comply with applicable codes.
3. Refer to Carrier System Design Manual for details
regarding piping techniques.
4. Wiring not shown for optional devices such as:
remote start-stop
remote alarm
optional safety device
4 to 20 mA resets
optional remote sensors