Specifications
INDEX
Abbreviations, 4
Attach to Network Device Control, 32
Automatic Soft Stop Amps Threshold, 35
Auto. Restart After Power Failure, 28
Before Initial Start-Up, 36
Calibrate Motor Current Demand Setting, 46
Capacity Override, 26
Carrier Comfort Network Interface, 40
Charge Refrigerant into Machine, 44
Check Starter, 41
Chilled Water Recycle Mode, 35
Cold Weather Operation, 48
Compressor Bearing and Gear Maintenance, 52
Condenser, 4
Condenser Freeze Protection, 28
Condenser Pump Control, 27
Control Algorithm Checkout Procedure, 54
Control Center, 4
Control Center (Inspect), 51
Control Modules, 63
Controls, 8
Control Test, 54
Cooler, 4
Customer Operator (Instruct), 46
Demand Limit Control, Option, 29
Design Set Points (Input), 42
Display Messages (Checking), 53
Dry Run to Test Start-Up Sequence, 45
Economizer, 4
Equipment Required, 36
Extended Shutdown, 47
Extended Shutdown (After), 48
Flow Switch (Field Supplied), 26
General, 8
General Maintenance, 50
Guide Vane Linkage (Checking), 50
Guide Vanes (Manual Operation), 45
Heat Exchanger Tubes (Inspect), 52
High Altitude Locations, 44
High Discharge Temperature Control, 26
Ice Build Control, 31
Initial Start-Up, 45
Inspect Water Piping, 40
Inspect Wiring, 40
Introduction, 4
Job Data Required, 36
Lead/Lag Control, 30
Leak Test Machine, 36
LID Operation and Menus, 12
Limited Shutdown (After), 47
Local Occupied Schedule (Input), 42
Lubrication Cycle, 7
Lubrication System (Check), 50
Machine Control Configuration (Set Up), 42
Machine Familiarization, 4
Machine Information Plate, 4
Machine Operating Condition (Check), 46
Machine Tightness (Check), 36
Manual Guide Vane Operation, 48
Motor-Compressor, 4
Motor Cooling Cycle, 6
Motor Starter, 4
Notes on Module Operation, 63
Oil and Oil Filters (Change), 51
Oil Changes, 51
Oil Charge, 42
Oil Cooler, 27
Oil Pressure and Compressor Stop (Check), 46
Oil Reclaim System, 8
Oil Specification, 51
Oil Sump Temperature Control, 27
Open Oil Circuit Valves, 36
Operating Instructions, 47
Operator Duties, 47
Options Module, 64
Overview (Troubleshooting Guide), 53
Physical Data, 66
PIC System Components, 8
PIC Systems Functions, 24
Power Up the Controls and Check the Oil Heater, 42
Preparation (Initial Start-Up), 45
Preparation (Refrigerant Transfer Procedures), 48
Prepare the Machine for Start-Up, 47
Pressure Transducers (Check), 53
Prevent Accidental Start-Up, 46
Processor Module, 64
Ramp Loading Control, 26
Refrigerant (Adding), 50
Refrigerant Charge (Adjusting), 50
Refrigerant Charge (Trim), 50
Refrigerant Filter, 52
Refrigerant Filter or Strainer (Change), 52
Refrigerant Float System (Inspect), 52
Refrigerant Leak Rate, 50
Refrigerant Leak Testing, 50
Refrigerant Properties, 50
Refrigerant (Removing), 50
Refrigerant Tracer, 36
Refrigerant Transfer Procedure, 48
Refrigeration Cycle, 4
Refrigeration Log, 48
Relief Devices (Check), 40
Relief Valves and Piping (Inspect), 52
Remote Start/Stop Controls, 27
Remove Shipping Packaging, 36
Repair the Leak, Retest, and
Apply Standing Vacuum Test, 50
Replacement Chiller Parts (Ordering), 53
Replacing Defective Processor Modules, 65
Rotation (Check), 45
Running System (Check), 47
Safety and Operating Controls (Check Monthly), 51
Safety Considerations, 1
Safety Controls, 24
Safety Shutdown, 36
Scheduled Maintenance, 51
Service Configuration (Input), 42
Service Ontime, 51
Service Operation, 33
Shutdown Sequence, 34
Solid-State Starter, 8
Spare Safety Inputs, 27
Standing Vacuum Test, 37
Starter Management Module (SMM), 64
Starting Equipment (Inspect), 52
Start the Machine, 47
Start-Up/Shutdown/Recycle Sequence, 34
Stop the Machine, 47
Surge Prevention Algorithm, 29
Surge Protection, 29
System Components, 4
Temperature Sensors (Checking), 53
Test After Service, Repair, or Major Leak, 50
Torque All Gasketed Joints, 36
Tower-Fan Relay, 28
Troubleshooting Guide, 53
Water/Brine Reset, 28
Water Leaks, 52
Water Treatment, 52
Weekly Maintenance, 50
Copyright 1995 Carrier Corporation
Manufacturer reserves the right to discontinue, or change at any time, specifications or designs without notice and without incurring obligations.
Book 2
Tab 5a
PC 211 Catalog No. 531-968 Printed in U.S.A. Form 19EF-3SS Pg 72 1196 4-95 Replaces: 19EF-2SS










