Specifications

CONTENTS
Page
SAFETY CONSIDERATIONS ...................1
INTRODUCTION ..............................4
ABBREVIATIONS .............................4
MACHINE FAMILIARIZATION ..................4
Machine Information Plate ....................4
System Components .........................4
Cooler .......................................4
Condenser ...................................4
Economizer ..................................4
Motor-Compressor ...........................4
Control Center ...............................4
Motor Starter ................................4
REFRIGERATION CYCLE ....................4-6
MOTOR COOLING CYCLE ....................6
LUBRICATION CYCLE .......................7,8
Summary ....................................7
Details ......................................7
Oil Reclaim System ..........................8
SOLID-STATE STARTER ......................8
CONTROLS ................................8-34
Definitions ...................................8
ANALOG SIGNAL
DIGITAL SIGNAL
VOLATILE MEMORY
General ......................................8
PIC System Components .....................8
PROCESSOR MODULE (PSIO)
STARTER MANAGEMENT MODULE (SMM)
LOCAL INTERFACE DEVICE (LID)
6-PACK RELAY BOARD
8-INPUT MODULES
OIL HEATER CONTACTOR (1C)
OIL PUMP CONTACTOR (2C)
HOT GAS BYPASS CONTACTOR RELAY (3C)
(Optional)
CONTROL TRANSFORMERS (T1-T4)
CONTROL AND OIL HEATER VOLTAGE
SELECTOR
LID Operation and Menus ...................12
GENERAL
ALARM AND ALERTS
MENU STRUCTURE
TO VIEW POINT STATUS
OVERRIDE OPERATIONS
TIME SCHEDULE OPERATION
TO VIEW AND CHANGE SET POINTS
SERVICE OPERATION
PIC System Functions .......................24
CAPACITY CONTROL
ENTERING CHILLED WATER CONTROL
DEADBAND
PROPORTIONAL BANDS AND GAIN
DEMAND LIMITING
MACHINE TIMERS
OCCUPANCY SCHEDULE
Safety Controls .............................24
SHUNT TRIP
Flow Switch (Field Supplied) .................26
Ramp Loading Control ......................26
Capacity Override ...........................26
High Discharge Temperature Control .........26
Oil Sump Temperature Control ...............27
Oil Cooler ..................................27
Remote Start/Stop Controls ..................27
Spare Safety Inputs .........................27
SPARE ALARM CONTACTS
Page
Condenser Pump Control ....................27
Condenser Freeze Protection ................28
Tower-Fan Relay ............................28
Auto. Restart After Power Failure ............28
Water/Brine Reset ...........................28
Demand Limit Control, Option
(Requires Optional 8-Input Module) ........29
Surge Prevention Algorithm .................29
Surge Protection ............................29
Lead/Lag Control ...........................30
COMMON POINT SENSOR INSTALLATION
MACHINE COMMUNICATION WIRING
LEAD/LAG OPERATION
FAULTED CHILLER OPERATION
Ice Build Control ............................31
ICE BUILD INITIATION
START-UP/RECYCLE OPERATION
TEMPERATURE CONTROL DURING ICE BUILD
RETURN TO NON-ICE BUILD OPERATIONS
Attach to Network Device Control ............32
ATTACHING TO OTHER CCN MODULES
Service Operation ...........................33
TO LOG ON
TO LOG OFF
HOLIDAY SCHEDULING
START-UP/SHUTDOWN/RECYCLE
SEQUENCE .............................34-36
Local Start-Up ..............................34
Shutdown Sequence ........................34
Automatic Soft-Stop Amps Threshold ........35
Chilled Water Recycle Mode .................35
Safety Shutdown ............................36
BEFORE INITIAL START-UP ................36-45
Job Data Required ..........................36
Equipment Required ........................36
Remove Shipping Packaging ................36
Open Oil Circuit Valves ......................36
Torque All Gasketed Joints ..................36
Check Machine Tightness ...................36
Refrigerant Tracer ...........................36
Leak Test Machine ..........................36
Standing Vacuum Test ......................37
Machine Dehydration ........................37
Inspect Water Piping ........................40
Check Relief Devices ........................40
Inspect Wiring ..............................40
Carrier Comfort Network Interface ...........40
Check Starter ...............................41
MECHANICAL-TYPE STARTERS
SOLID-STATE STARTERS
Oil Charge ..................................42
Power Up the Controls and
Check the Oil Heater ......................42
SOFTWARE VERSION
Set Up Machine Control Configuration .......42
Input the Design Set Points ..................42
Input the Local Occupied Schedule
(OCCPC01S) ..............................42
Input Service Configurations ................42
PASSWORD
INPUT TIME AND DATE
CHANGE LID CONFIGURATION
IF NECESSARY
MODIFY CONTROLLER IDENTIFICATION
IF NECESSARY
INPUT EQUIPMENT SERVICE PARAMETERS
IF NECESSARY
2