Technical data

Installation and Service Guide N5250-90001 3-13
PNA Series Microwave Network Analyzer System System Installation
N5250A PNA, Controller, and Test Head Module Interconnections
Sequence of Test Head Module Connections
NOTE Use a 57 N-cm (5 in-lb) torque wrench to tighten the SMA connectors and a 90 N-cm (8 in-lb)
torque wrench to tighten the 1.85 mm and 3.5 mm connectors.
The connectors on the backs of the test head modules are very closely spaced. Attaching cables to these
connectors is easiest if they are attached in the following sequence as illustrated in Figure 3-7.
BIAS; +12V @ 1.5A
RF INPUT; SMA connector, 11.17–19.33 GHz @ +5 to +13 dBm
LO INPUT; SMA connector, 8.37–14.5 GHz @ +5 to +13 dBm
Ref IF; SMA connector
Test IF; SMA connector
RCVR A or B; 1.85 mm connector
RF IN (Port 1 or 2); 1.85 mm connector
Ground unit (GNDU); sub mini-triax connector (N5250C Options 017 and 018)
Sense; sub mini-triax connector (N5250C Options 017 and 018)
Force; sub mini-triax connector (N5250C Options 017 and 018)
Figure 3-7 Test Head Module Cabling Sequence