Specifications

Hurricane Track TRANSPORT MACHINE
21
THE TRAILER MUST BE SECURELY ATTACHED TO THE TOW VEHICLE
BEFORE LOADING OR UNLOADING THE STUMP GRINDER.
DO NOT LOAD OR UNLOAD ON ANYTHING OTHER THAN LEVEL GROUND.
LOADING
Start the machine using the key-switch on
the machine control panel and turn on the
radio control and push the ON button.
Increase engine RPM and raise cutter head
to clear the ground.
Position the machine behind the trailer and
close to the loading ramps. Push the
forward track controls on the remote control
and watch closely to make sure both tracks
stay on the ramps while loading. KEEP
THE MACHINE AS LEVEL AS
POSSIBLE.
Continually adjust the cutter head height as
you go up the ramps, keeping the mass as
low to the ground as possible, especially if
you load the machine with the cutter wheel
first.
When the machine is loaded, lower the
cutter head and turn off the machine.
Secure the machine tightly with sufficient tie
downs to prevent any movement in transit.
UNLOADING
With trailer still securely attached to tow
vehicle, remove tie down straps and make
sure ramps are securely attached to trailer
and positioned correctly to unload the
machine.
Start machine using the key-switch on the
machine control panel. Turn on the radio
control and push the ON button, increase
engine RPM, and raise cutter head to clear
the deck and ramp.
Continually adjust the cutter head up and
down to keep the mass as low to the ground
as possible. Watch to make sure both tracks
stay on the ramps.
Raise cutter head and proceed to the work
site using extreme caution on hills and
uneven terrain. Use the gear and flow
controls in high position to get to the job site
faster and use the gear and flow controls in
low to make climbing easier. See the
Machine Controls section for more
information.