Specifications

I & M BULLETIN
HPTO8TD-100
HYDRAULIC POWER TAKE-OFF
9/11/2007
3
of
3
8. Once the HPTO housing is piloted and
flush with the engine housing, you can
remove the crane support.
9. Install customer supplied sheave and
QD bushing to the output shaft of the
HPTO. Insure that belts (once
installed) will be aligned and track
straight.
10. Tension Belts according to Equipment
Manufactures specifications.
11. Install proper safety guards (not
supplied by PT Tech®).
12. The Manifold Assembly has been
preinstalled on the HPTO Clutch at the
factory. Do not remove the manifold
unless rebuilding the HPTO unit. See
manifold drawing provided for hose
fitting sizes and connection locations.
13. Install the Microprocessor Controller
and all electrical wiring per the
Controller I&M Bulletin.
Hydraulic Instructions
Refer to the manifold and hydraulic
schematic provided for all hydraulic
connections.
14. All hoses must be thoroughly flushed.
All hoses should be ½” diameter
minimum that are connected to the
“inlet” and “tank” ports on the manifold.
(All hose is customer supplied.)
15. Connect all hoses per the hydraulic
schematic provided.
16. Insure that the hydraulic fluid reservoir
is filled to the proper fluid level.
17. Insure that there is a clean 15-micron
minimum oil filter in the hydraulic
system.