External Load Calculation for Buried Conduit

EXTERNAL LOAD CALCULATIONS FOR DIRECT BURIED CONDUIT
DEFLECTION (X) IS THE RATIO OF THE INSIDE DIAMETER (LOADED)
VERSE THE INSIDE DIAMETER (UNLOADED) OF THE CONDUIT OR DUCT
(5% = 0.05). THE INSIDE DIAMETER (I.D.) CAN BE CALCULATED BY TAKING
THE OUTSIDE DIAMETER (O.D.) AND SUBTRACTING TWO (2) TIMES THE
WALL THICKNESS (t). I.D. = (O.D. - 2*t).
BEDDING SOIL MODULUS (E
1
) SHALL BE 2000 lb/in
2
FOR TYPE I SOIL AND
1000 lb/in
2
FOR TYPE III SOIL.
A DEFLECTION LAG FACTOR (D) OF 1.5 IS A COMMONLY USED VALUE.
A BEDDING CONSTANT (K) OF .1 IS A COMMONLY USED VALUE.
PIPE STIFFNESS (PS) OF THE CONDUIT OR DUCT IS EITHER
PREDETERMINED OR CALCULATED BY USING THE FOLLOWING
FORMULA:
PS = E*I/(0.149*r
3
)
PS = PIPE STIFFNESS (lb/in
2
)
E = MODULUS OF ELASTICITY IN TENSION (lb/in
2
)
I = MOMENT OF INERTIA (in
3
)
r = MEAN RADIUS (in)
MODULUS OF ELASTICITY (E) OF PVC FOR THE CONDUIT OR DUCT IS
EQUAL TO 500,000 lb/in
2
. HDPE CONDUIT OR DUCT MODULUS OF
ELASTICITY (E) IS EQUAL TO 150,000 lb/in
2
.
Gross Automation (877) 268-3700 · www.carlonsales.com · sales@grossautomation.com