User guide
Carlin part number MNEZ123 Rev. 07/13/11
– 18 –
Model EZ-1/2/3 oil burners — Instruction manual
Wire burner — 50200 primary control
1. Allwiringmustcomplywith:
• IntheU.S—theNationalElectricalCode,ANSIZ223.1/NFPA54.
• InCanada—theCanadianElectricalCodePart1,CSAstandardC22.1.
• Allapplicablelocalcodes/standards.
2. Wire the burner following Figure15 and any special instructionsor wiring
diagram provided with the appliance, burner or other components.
3. The burner requires a 120
vac/60 hz/single-phase power supply, with at least
a5-
ampfuse.Thecurrentdraw(equippedwithCarlinPSCmotor)willbeap-
proximately2.5
amps.
4. The50200thermostatterminalsprovideapowersource.Neverapplyexternal
power to these terminals under any circumstances. To avoid this problem when
usingzonevalves,disconnecteldwiresfrom50200thermostatterminals.Then
connectavoltmeteracrossterminals.Operateallzonesandverifythatthere
isneveravoltagereadingatthemeter.Avoltagereadingindicatesincorrect
wiring that must be corrected before attempting to operate the burner.
5. Alarmterminalsprovidea24
vac-rated dry contact, suitable for use with security/
realarmsystemssuchasCarlinSecureHeat™.
6. Make sure the burner and appliance are correctly wired and the line switch is
properly fused for the load.
To start burner
Donotstarttheburnerifthecombustionchambercontains
oil or oil vapor.
1. TurnserviceswitchOFF.
2. Perform inspections and checkouts on pages 18 and 19.
3. Sliponeendofa3/16-inchI.D.clearplastichoseoverendofbleedvalve,the
other end into a container. Then open bleed valve.
4. Setthermostat(operatingcontrols)tocallforheat.
5. TurnserviceswitchON.
6. Bleedoillineuntilplasticlineisfreeofbubbles;thenanother15secondslonger.
(Shouldtheprimarycontroltimingcausealockoutduringpurging,restartthe
burnerfollowingtheprimarycontroldatasheetinstructions.)
7. Close bleed valve. The burner should cycle through the sequence given in the
primary control data sheet.
8. Performprimarycontrolamefailurelockoutandsafetytimingtestsperinstruc-
tions in primary control data sheet.
9. Shouldcontrol/burnerfailtooperatecorrectly,seepage19forsuggestionsin
troubleshooting.
4. Wire burner • start burner — 50200 primary control
Figure 15 EZ-123 burners wiring using Carlin 50200 primary control (see appliance manual or separate wiring information for
burner equipped with a primary control not covered in this manual)
Turn off power to appliance when servicing burner. Failure to comply could result in severe personal injury, death or substantial property damage.