User manual
46
ENG
“UEX-PLUS” +03U220621 - rel. 1.4 - 04.08.2009
installeruserservice
one cable turn one turn of the two
cables of the same phase
two cable turns of the
same phase
one cable in “double
turn” mode
three cable turns of the
same phase
700
500
300
100
C
700
500
300
100
700
500
300
100
700
500
300
100
700
500
300
100
700
500
300
100
C
700
500
300
100
700
500
300
100
700
500
300
100
700
500
300
100
700
500
300
100
C
700
500
300
100
700
500
300
100
700
500
300
100
700
500
300
100
700
500
300
100
C
700
500
300
100
700
500
300
100
700
500
300
100
700
500
300
100
700
500
300
100
Fig. 13.a Fig. 13.b Fig.13.c Fig.13.d Fig.13.e
Important:
to avoid interference, separate the power cables from the probe cables.
•
TAM congurations and connections (transformer for measuring the current)
Important: the congurations and connections are already made
by CAREL, and no changes are required. The following diagrams
represent possible connection modes and may be useful in the event of
serious electrical malfunctions on the humidier.
All operations must only be performed by qualied personnel, improper
use may cause serious damage.