Owner`s manual

PD300MHR
Mechanical Height Rod Installation
The Mechanical Height Rod is packed in its own carton inside the main carton. Before starting
installation, please unpack carefully and remove all plastic wrappings, foam fillers and cardboard
material. You should have the following components:
(1) Detecto Mechanical Height Rod (MHR)
(2) Mounting Brackets
(1) Hardware Pack, containing:
(4) #8-32x1/2” Pan Head Screws (mounting bar to bracket)
(4) #8-32 Hex Nuts
(4) M4x8.0 PM Screws (bracket to column)
(4) Lock Washers (bracket to column)
(2) #8-32 Hex Head Screw (MHR to mounting bar)
(1) Wrench
#8-32 Pan Head Screw
#8-32 Hex Head Screw
#8-32 Hex Nut
M4x8.0 Machine Screw
Wrench
Lock Washer
#8-32
Hex Nut
Mounting
Bracket
Mounting
Bracket
#8-32 Hex
Head Screw
#8-32 Pan
Head Screw
#8-32 Hex
Head Screw
Mounting
Bar
#8-32 Pan
Head Screw
1. Referring to Figure No. 23, align a
bracket with the holes near the top
of the mounting bar and install two
(2) #8-32x1/2” Pan Head screws
and #8-32 Hex nuts to secure the
bracket to the mounting bar.
2. Next, align the other bracket with the
lower holes in the mounting bar and
install two (2) #8-32x1/2” Pan Head
screws and #8-32 Hex nuts to
secure the bracket to the mounting
bar.
3. Install the two (2) #8-32 Hex Head
screws in the threaded holes in the
mounting bar and tighten them with
the included wrench until the hex
heads are 1/8" from the bar
#8-32
Hex Nut
Figure No. 23
0044-M340-O1 y ProDoc Series
Page 15