Owner`s manual

8551-M912-O1 Rev D PL400 Owner’s 3
INSTALLATION
The Detecto PL400 Patient Lift Scale Indicator is a completely self-contained, battery-powered
instrument that is used to determine the weight of a person suspended from a portable patient
lift mechanism. The PL400 consists of a weight indicator with an integral tension load cell and
with its small size and simple, easy operation; it can be used where standard indicators are too
large and cumbersome. Setup and Operation of the PL400 can be quickly learned using the
following instructions and guidelines.
Before beginning installation of your PL400 Patient Lift Scale Indicator, make certain the
instrument has been received in good condition. When removing the indicator from its
packing, inspect it for signs of damage, such as exterior dents and scratches. Keep the carton
and packing material for return shipment if it should become necessary. It is the responsibility
of the purchaser to file all claims for any damages or loss incurred during transit.
1. Remove the instrument from the shipping carton and inspect it for any signs of damage that
might have taken place during shipment such as exterior dents and scratches.
2. Install the battery. Refer to the BATTERY REPLACEMENT section for more instruction.
3. Place the indicator on the hook of the patient lift mechanism.
4. The indicator is now ready for use.
BATTERY REPLACEMENT
The PL400 uses a single 9 volt alkaline battery. The battery is contained in a battery holder
inside the instrument. Access is via a removable panel on the back of the indicator.
To install the battery, turn the indicator so that the display is facing down (away from you) and
resting on the keypad. Locate the rectangular panel on the back of the indicator and remove
the thumbscrew retaining it (see Figure 1). Remove the panel exposing the battery holder.
Install the 9 volt battery in the holder; making certain it is positioned in accordance with the
polarity markings located in the battery holder. Refer to Figure No. 2 for illustration of battery
installation.
Figure No. 1 Figure No. 2