Specifications

C 85-340 Boiler Assembly - Installation & Operation Instructions Caprice
9
4.0 BOILER ASSEMBLY
The installation of the boiler shall be in accordance with the authorities having jurisdiction and must comply with
Standard CSA B139 (Canada) or NFPA 31 (USA).
Fiberglass Materials - Before installing the insulated jacket, read “Handling Instructions
in Section 11.0 and the protective measures recommended when handling fiberglass.
Jacket Installation
1. Do not fully tighten screws until jacket assembly is complete.
2. Level the boiler before commencing jacket installation.
3. Remove all protective plastic film on the jacket parts before installing.
4. Fasten front and back panels to the base pan (Figure 4-1). Do not fully tighten screws at this time.
5. Attach sides, positioning them over the front panel, rear panel, and base pan (Figure 4-2).
6. Mount top panels (front and back) over water pipes and smoke hood (Figure 4-3).
7. Fully tighten all jacket screws to secure panels in place.
8. Mount Tridicator and Well on the boiler as shown (Figure 4-4).
9. Position the HydroStat 3250 over well and secure in place from underneath. See instructions included with
10. Insert sensor fully into the well or boiler overheating may occur. See instructions included with HydroStat.
Figure 4-1 Front & Rear Panels
Figure 4-2 Side Panels
Figure 4-3 Top Panels
Figure 4-4 Tridicator, Well & HydroStat 3250
Front Panel
Back Panel
Base Pan
Right Side
Coil Side
Standard Well
Tridicator
HydroStat
3250
Failure to install the sensor fully into
the well may cause boiler overheating
resulting in fire, damage, or death.
Top Front
Top Back
Smoke Hood_
Outlet