Inspection Address: 123 Main Street, Anytown, NJ 07777
Inspection Date/Time: 7/8/2008 2:00 pm to 5:00 pm
_____________________________________________________________________________________________
detecting the flow of electrical current outside its circuit. GFCI devices are very sensitive to changes in the
electrical current, (even as little as .005 amp) and will, in most cases, trip off in thousandths of a second,
thus potentially protecting individuals. Our report reflects the functionality of the installed GFI's, along with
areas where today's industry standards now require them to be. These inexpensive life-saving devices
should be installed where required, and therefore you should check with your municipality or a licensed
electrician. Comment: Critical equipment such as refrigerators, freezers, security systems, garage door
openers, sump pumps, sewage ejector pumps and alarms, should not be powered by GFCI's unless properly
rated because the equipment will not operate if the GFCI trips. More information can be obtained at
http://www.cpsc.gov/cpscpub/pubs/99.html
Main Panel
Basic Main Panel Comments
Informational Conditions
¬
Industry safety standards require that an electrical panel should be weatherproof, readily accessible, and
have a minimum of thirty-six inches of clear space in front and 30 inches on the side, with lighting, for
service. Also, it should have a main disconnect or less than six handles, and each circuit within the panel
should be clearly labeled. We recommend review with a licensed electrician with any dwelling that has
panels that do not meet these requirements.
¬
The main panel and its visible components have no deficiencies. Note; many electrical panels consist of
several branch wires, which limit our observation and evaluation.
Acceptable Main panel scan
Cover Panels
Informational Conditions
¬
The cover for the main electrical panel is in acceptable condition.
Circuit Breakers
Informational Conditions
¬
There are no visible deficiencies with the circuit breakers in the main electrical panel.
_____________________________________________________________________________________________
This report has been produced in accordance with our signed contract and is subject to the terms and conditions agreed upon therein.
All printed comments and the opinions expressed herein are those of A Full House Inspection Co. LLC.
Inspection Narratives - Page 27