Installation & Assembly

KIT INSTALLATION GUIDE
DELIVERY IS OFFERED
or Materials can t in a
Truck, SUV, or Van.
Choose your cedar posts and pick the best end for
the top. Use a block or item to be reference for
height for all posts. For Above Ground: Important p
to remember is to decide how high o the ground
you want the kit posioned. Kits are Pre-Drilled.
Our walls are built with
rain guards. These will be
the wider boards of the
structure built in to the
top of the wall. This part
of the wall will be the top.
With the Pre-Drilled holes as reference use the
Timberlocks™ in your Hardware Pack and connect
a large wall to a cedar post. Make sure the inside
of the wall is ush to the cedar post. Repeat for the
second large wall.
Next, aach one wall to the house. Always mak-
ing sure the wall is level. Then, measure one of the
walls as reference to use for the space along the
back side of the house for house mounng.
Standard Installaon
Above Ground & House Mount 8’ Posts are used
Complete the second wall mount.
Make sure the distance from the 1st
wall mount is the right size (size of
the wall panel) and level. Use a refer-
ence point against the wall or mark
of with a pen / marker.
Then, install the second wall and
make sure it is level.
3