Installation & Assembly

KIT INSTALLATION GUIDE
The ‘83 Installaon
Above Ground & House Mount 8’ Posts are used
11
Its so easy, you can stop
and smell the owers.
Our walls are built with rain guards.
These will be the wider boards of the
structure built in to the top of the wall.
This part of the wall will be the top.
Aach the posts to the large panel walls.
Note: You can adjust the height along the post and all must be that
measurement. Use our mberloks provided in the boxes.
It’s that easy. Connue along where the marks are screwing the Timberloks to the
posts. This can be done with the assistance of someone.
When nished, bring the wall panel to the area on the house. Make sure the distance
is accounted for between the (2) walls that are being mounted.
Drill with screws at an angle into the house. You can use Timberlok
screws and go about 45 degrees.
Note: If you are using against stone, please get in touch with us for
recommendaons for mounng.
As always....make sure EVERYTHING is
level and properly measured for spacing.