User Guide

Quick Start Guide
- 5 -
Native
soil
Min.
6"
Fill with water to static level
Fill with water to static level
Native soil
Concrete slab
Continue fill of
Crushed aggregate
material approximately
3/4" size rock,
pea gravel or sand
Continue fill of
Crushed aggregate
material approximately
3/4" size rock,
pea gravel or sand
6. Replace cover(s) and backll
Replace cover(s) and protect with cardboard or similar
during back lling. Backll per specication (See Page 8).
If installing Remote Pump option do
so now (See Page 13)
5. Fill tank
Fill tank with water to static water level. This provides stability
and crush resistance during backlling. Check connections made
for any leaks.
For inspection testing DO NOT PRESSURE the tank. Plug
lines inside interceptor to test upstream and downstream
integrity.
See page 6 for Canplas
cleanout part numbers
7. Riser Extensions (optional)
Depending on your application, extend the tank risers
(using 40100AX35) to grade/oor level. Be sure to account
for nishing. (Refer to Manual 40100X35-8 – Riser Extension
Installation Guide)
8. Finish to grade
For in ground applications with vehicular trac, the upper 8” requires a
reinforced concrete slab. Refer to the Installation Specication section of
this document (See Page 8-9). This details backll materials and concrete
reinforcement requirements.
9. Completion documentation
Having completed installation and successful inspection, hand-over the installation and all documentation to the client.
Fill out your sections of the Limited Lifetime warranty registration (See Page 24).
Submit Online at: www.canplasplumbing.com/WarrantyRegistration.aspx or by fax to 1-888-432-2201 (CAN) or
1-888-461-5309 (USA)
72”
Maximum
height
72”
Maximum
height
Vehicular traffic reinforced concrete
Reinforced concrete pad for traffic rated installations
8"
8"
WARNING!
X
DO NOT
PRESSURE TEST.
RISK OF SERIOUS
INJURY.
For Spec See Page 8-9