User Guide

Installer Handover Checklist
- 14 -
Installation made by (Company) ___________________________________________________________
Installer (Name) __________________________________________________________________
Installer Contact (Tel) _________________________________
Completed on (Date) _________________________________
Model Installed: q Canplas Endura® XL100 (40100A04 (T) / 100GPM)
q Canplas Endura® XL75 (4075A04 (T) / 75GPM)
Installation Format: q On-Floor q In Floor - Inside Building q Floor Below (eg. basement)
q In-Ground - Outside building
Slab Poured per Spec for Trac Rated Install q Yes q No (See Page 8-9)
Flow Control Format: q Internal (Inside Inlet Bae)
q External (Upstream of Interceptor)
If External Flow Control…
Internal Flow Control plate removed q Yes q No (See Page 12)
Flow Control Location(s) ____________________________________________________
Connections & Cleanouts (Mark where installed):
Extension Risers added: q Yes - if Yes, approx. length of riser installed: _________in /m
q No
Flow Control Handle Extended: q Yes q No (See Riser Extension Instructions))
Air Balance/Sampling Cap in place: q Yes q No (If No, Replacement required. See Page 16)
Entered Information on Warranty Page q Yes q No
Something Canplas needs to know?
Tell us direct at… www.enduraXL.com/tellCanplas
Installer Handover Checklist
The following checklist completed by your installer provides key information regarding your XL grease interceptor and
the way it has been installed. If it is not completed contact your installer and complete with them by phone or other
appropriate means.
G
REAS E I NTE
RCEP
T
OR
GREA SE INT
ERC
EPTOR
G
REAS E I NTE
RCEP
T
OR
GREA SE INT
ERC
EPTOR
Cleanout
G
REAS E I NTE
RCEP
T
OR
GREA SE INT ER C
EPTOR
G
REAS E I NTE
RCEP
T
OR
GREA SE INT ER C
EPTOR
OUTSIDE -
SIDE -
OUT
END - OUT
IN
OUT
IN
Cleanout
Cleanout
External
Flow
Control
Cleanout