Specifications
InstallationandOperationManual(REVH) PVI6500/PVI7500
36
WatchforblinkinggreenLEDandLCDmessagesindicatinga5‐minuteconnecttogridcountdown.Followingthistime,
theinverterwillcomeon‐lineandbegintofeedpowerintotheACcircuit.
Lastly,lookforasteadygreenLED,indicatingtheinverterisnowoperatingat
theMaximumPowerPointofthearray.
SeeLCDsection(4)ofmanualfordetaileddescriptionofmessagesandindications.
Operation:
The control electronics will be active as soon as DC (PV) voltage reaches 200VDC.The inverter will connect to the
utility/buildinggridwhentheDCvoltagefirstexceeds260VDC
(strikevoltage).Next, theinverterwillloadthearray,
bringingtheDCvoltagedownfrom260VDCtonolessthan230VDC.
OncethereisenoughPVpowerat230VDCtofeedbackACpower,theinverterwillautomaticallystarttodoso.
Operatingstates,GFDIstatusanderror indications
shownbytheLEDindicators,aswellasLCDdata,modeanderror
codesaredescribedinchapter4,“Power,GFDI,ErrorLEDIndicatorsandLCDDisplay”.










