Operation and Maintenance Manual

CANAM TECHNOLOGY, INC. (CTI)
MARK-IV VHF BROADBAND SIGNAL BOOSTER M4BBDAV O&M MANUAL
Page 23 of 39
Rev0 April/2015
Provide a network connection to the system, directly into the ECM LAN
port.
o Use an Ethernet crossover cable for direct connection to a PC
computer LAN port.
o Use a standard straight-thru cord when using a network
switch/hub connection
Once the physical connection has been established, power-on the device.
Wait a 2 minutes period for the embedded management software to load-
up.
After the load up is completed, the device’s LCD display will look like this
once:
View alarms
View meters
Network Info
Now the device is ready for management functions using the web-browser
on the PC computer.
E.1 GENERAL GUIDELINES REGARDING RF CONNECTIONS &
OPERATIONS WITH TEST INSTRUMENTS
Mute the MCPA prior to connect a signal source to the RF IN PORT.
Avoid excessive input power.
o Do not drive the input signal above -20 dBm, which is the
recommended maximum input level (composite).
Make sure your RF Test Instrument (Communications Monitor, Spectrum
Analyzer, etc) has an input port rated for high RF power.
o Do not exceed the test-instrument’s input rating.