Full Product Manual
7
5) Align 2nd Intake Hose within the
existing slot in Foam Panel 2 (C). Begin
feeding Hose around the tub, through
Foam Panel 2, towards the Portable
Control Unit located on Foam Panel 1 (D).
7) Pull the Spa Top Liner down and align
with Spa Base Liner. Zip the two liners
together.
TIP: Ensure top and bottom zippers are
aligned before pulling the Top Liner down.
8) Smooth out wrinkles in the liner to the best of your ability and
pat out any pockets of air.
6) Attach the clear Intake Hose to the integrated Connection
Hoses. Place the clamp around the Intake Hose (fed through
exterior Foam Panels 1-3) and fasten the clamp with a flat-end
screw driver as close to the PCU as
possible. Ensure seal is water tight!
3. Spa Assembly
1) Take the Thermal Ground Sheet and
position it where the footprint of the
spa will be. Take the Spa Base Liner
and position it on top of the ground cloth.
2) Position Foam Panel 1 first and then add
Foam Panels 2 and 3 to the right of Panel
1. Ensure exact alignment between holes
in the foam and holes on the liner.
3) Place remaining blank Foam Panels
next to Foam Panel 3 until spa is
complete. Ensure the 3 holes in Foam
Panel 1 remain aligned with holes in the
Spa Base Liner.
TIP: Gripping the Foam Panel on both
sides and giving it a small
wiggle can help guide it in if it
gets stuck.
4. Connect the Portable Control Unit to the Spa
Position the PCU next to the spa, remove the Inflation Hose and align the Connection Hos-
es to the spa. Ensure that the hoses have ‘O’ ring gaskets inserted correctly (see fig. 1) at
each end. Please do not over tighten and check that the Connection Hoses are straight and
not kinked.
Fig 1. Ensure thicker part of
‘O’Ring Gasket faces inwards
4) Insert Spa Top Liner into the center of the
tub. Feed the integrated Connecton
Hoses and the Drain Hose through the
holes in Foam Panel 1 and the Spa
Base Liner (A). Loosen and remove clamp
that comes on 2nd Intake Hose
(B). Feed 2nd Intake Hose through the
hole in Foam Panel 3.
2. Test GFCI & Inflate Lid
a) Perform GFCI Test
WARNING: RISK OF ELECTRIC SHOCK. The GFCI plug must be
tested before each use. Do not use if GFCI test fails.
1. Insert the plug into the power outlet.
2. Press the “RESET“ button, the indicator light turns red.
3. Press the “TEST” button, the indicator light turns off.
4. Press the “RESET” button, the indicator light turns red; the pump is ready to use.
1 2 3 4
b) Inflate the Lid
Before the lid is inflated ensure the Valve Stopper (A) is fully pushed in to avoid air leaking
out. Connect the Inflation Hose to the Inflation Port on the PCU and then connect the
other end to the Inflation Port on the lid (B). Press the Massage Button (C) to inflate the lid.
Once inflated close the Valve Cap (D).
(A) (B)
(C)
(D)
(A)
(B)
(C)
(D)
6