Specifications

Section 1. General
This section provides preparation and siting information as well as specifications.
1.1 Installation Tasks
1.1.1 Indoors
Immediately upon receipt of your shipment…
Open shipping cartons.
Check contents against invoice. Contact CSI immediately about any
shortages.
Several days prior to the planned installation date…
Collect tools and site information (Section 1)
Assemble datalogger, communications device, and power supply in
enclosure (Section 3)
Install datalogger support software on PC (Section 5)
Establish communications between the datalogger and the PC
Program datalogger, test sensors, and retrieve data
Trial run the tower / tripod installation, assembling as much as
possible (Section 2)
Repackage equipment for transport to the field site
1.1.2 Outdoors
Locate suitable site (Section 1)
Prepare tower base (Section 2)
Raise tower (Section 2)
Install instrumentation enclosure (Section 3)
Install sensors (Section 4)
1-1